Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct electrical tests on HV electrical machines

Conduct electrical tests on HV electrical machines

Unit of competency
National Code
UEEEL0032
State Code
OBX80
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/11/2024
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to conduct electrical tests on high voltage (HV) electrical machines.It includes preparing and conducting electrical inspections and tests on a three phase induction machine and completing workplace documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to conduct electrical tests on a three phase induction machine
  • 1.1 WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 WHS/OHS risk control measures and workplace procedures for work preparation are followed
  • 1.3 Scope of work is determined from job sheets, specifications and regulatory requirements
  • 1.4 Advice is sought from work supervisor to ensure work activity is coordinated effectively with others
  • 1.5 Materials required for work are obtained in accordance with workplace procedures
  • 1.6 Tools, equipment and testing devices required for work are obtained and checked for operation and safety
2 Conduct electrical tests on a three phase induction machine
  • 2.1 WHS/OHS risk control work measures and workplace procedures are followed
  • 2.2 Machines/equipment are isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.3 HV electrical inspection and tests are conducted to determine cause of faults and/or operational condition of the machine
  • 2.4 Status of the machine is determined from inspection and test results and recorded in accordance with workplace procedures
  • 2.5 Problem-solving techniques are used to resolve unplanned events
  • 2.6 Quality of work checks are conducted to ensure coils are correctly wound with correct wire, number of turns and shape in accordance with workplace procedures and work instructions
  • 2.7 Work is completed in accordance with given timeframe, environment and workplace procedures
3 Complete work report
  • 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2 Status of HV electrical machine is documented in accordance with workplace procedures and relevant person/s notified
No information
No information
Replaces
State Code National Code Title Type
WC502 UEENEEG158A Conduct electrical tests on HV electrical machines Unit of competency