Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Undertake basic estimation and costing

Undertake basic estimation and costing

Unit of competency
National Code
CPCCCM1011A
State Code
D7346
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
03/10/2012
Field of Education
040307 - Building Construction Economics
Original Release Date
03/10/2012
Nominal Hours
14
Description
This unit of competency specifies the outcomes required to estimate materials, labour and time requirements and establish costs for a basic construction project.
Notes
Elements and Performance Criteria
1. Gather information.
  • 1.1. Details of project requirements are obtained from information supplied for planning and preparation of estimating and costing.
  • 1.2. Details of products and services to be provided are compiled.
  • 1.3. Delivery point and methods of transportation are determined where necessary.
  • 1.4. Details are recorded in accordance with enterprise practice.
2. Estimate materials, time and labour.
  • 2.1. Types, quantities and quality requirements of materials required for the construction project are estimated, including meeting environmental requirements.
  • 2.2. Labour requirements to achieve construction outcomes and/or perform required services are estimated.
  • 2.3. Time requirements to construct and/or perform required services are estimated.
3. Calculate costs.
  • 3.1. Total materials, labour and overhead cost allowances are calculated in accordance with enterprise procedures.
  • 3.2. Total job cost is calculated, including overheads and mark-up percentages.
  • 3.3. Final cost is calculated.
4. Document details and verify where necessary.
  • 4.1. Details of costs and charges are documented in accordance with enterprise practice.
  • 4.2. Costs, calculations or other details are verified in accordance with enterprise practice.
  • 4.3. Details are documented for future reference in accordance with enterprise practice.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and specifications
relevant Australian standards
safe work procedures related to carrying out basic estimation
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
gathering and basic analysis of project plans and specifications
confirmatory work site inspection and determination of work requirements.
Estimation and costing includes:
overhead allowances
labour and materials
use of calculators and/or computers running appropriate software for estimating and calculating necessary details.
Quality requirements include:
internal company quality policy and standards
manufacturer specifications, where specified
relevant regulations, including Australian standards
workplace operations and procedures.
Materials for estimation and job costing include:
bagged materials
bricks
building elements, such as roof trusses, lining materials, flooring materials, prefabricated elements, boxed, drummed and tinned materials
other sheet materials applicable to construction
reconstituted timber products
sand
soil and aggregates
timber.
Environmental requirements include:
clean-up management
waste management.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools and equipment
communicate and work effectively and safely with others
document and communicate work-related information, including work orders, specifications, products, materials and labour requirements, costing calculations for products, materials and labour, and special conditions for a specified construction project
estimate and cost a specified project, including:
estimate quantities of material required
determine types and amount of labour required to complete the work
estimate time required to complete the work
estimate overheads associated with the project.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W9363 CPCCCM1001A Undertake basic estimation and costing Unit of competency
Replaced By
State Code National Code Title Type
OCQ32 CPCCCM1011 Undertake basic estimation and costing Unit of competency