Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install block parquetry flooring

Install block parquetry flooring

Unit of competency
National Code
MSFFL3033
State Code
WI390
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
60
Description
This unit of competency covers preparing, setting out, cutting and installing block parquetry flooring in domestic and commercial sites.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to the installation of block parquetry are verified and complied with
  • 1.2 WHS requirements, including personal protection needs, are observed throughout the work
  • 1.3 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • 1.4 Sub-floor condition is assessed for suitability for installation of block parquetry flooring consistent with Australian Standards, industry standards and manufacturer recommendations
  • 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.6 Skirting boards or cover trims are removed or undercut if required and stored for re-fitting
  • 1.7 Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
2 Set out block parquetry flooring
  • 2.1 Block parquetry flooring are acclimatised according to manufacturer recommendations
  • 2.2 Block parquetry flooring for fixing are organised and used in accordance with relevant safety management requirements
  • 2.3 Adhesives and edge strips are prepared for use as required
  • 2.4 Area to be covered is measured, working lines and starting point are established
3 Lay out and cut parquetry blocks
  • 3.1 Instructions and sequence for laying and fixing are followed
  • 3.2 Appropriate underlay is laid according to manufacturer recommendations
  • 3.3 Block parquetry flooring is laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins
  • 3.4 The aesthetics of the materials are maximised, including matching grains and colours
  • 3.5 Parquetry blocks are accurately and clearly marked for cutting
  • 3.6 Parquetry blocks are cut, where required, to provide appropriate size and shape ensuring minimum waste
4 Install block parquetry
  • 4.1 Adhesives and edge strips/accessories are prepared for use as required
  • 4.2 Adhesives are used following workplace procedures
  • 4.3 Fixing methods and equipment are used following manufacturer recommendations
  • 4.4 Parquetry is installed and fixed to produce required pattern
  • 4.5 Appropriate field and perimeter expansion joints are allowed
  • 4.6 Skirting boards or cover trims are fitted/re-fitted and finished
  • 4.7 Finished job is inspected and any imperfections are rectified following workplace procedures
5 Complete housekeeping
  • 5.1 Unused materials are stored or recycled as required
  • 5.2 Tools and equipment are cleaned and stored appropriately
  • 5.3 Work area is cleaned and rubbish disposed of appropriately
  • 5.4 Workplace documentation is completed
No information
No information
Replaces
State Code National Code Title Type
W8583 LMFFL3505A Install block parquetry flooring Unit of competency
Replaced By
State Code National Code Title Type
OAJ47 MSFFL3081 Install block parquetry flooring Unit of competency
State Code National Code Title Type
J736 MSF30813 Certificate III in Flooring Technology Qualification