Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop and validate distribution and sub-transmission switching programs
Develop and validate distribution and sub-transmission switching programs
Unit of competency
National Code
UETDRSO015
UETDRSO015
State Code
OED65
OED65
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
17/02/2023
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
17/02/2023
Nominal Hours
55
Description
This unit includes the skills and knowledge required to develop and validate distribution and sub-transmission switching programs in the electricity supply industry (ESI).It includes types, characteristics and capabilities of electrical apparatus, sources of possible back-feed, high voltage (HV) isolation and earthing procedures, and operating agreements.It also includes establishing the purpose of the HV switching program, procedures for analysing data, and writing a switching program.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to develop and validate distribution and sub-transmission switching programs
- 1.1 Purpose for the distribution and sub-transmission switching program is determined
- 1.2 Data is analysed and expected work outcomes are determined
- 1.3 Hazards are identified, risks assessed, and control measures identified and applied
- 1.4 Work plan is developed, validated and communicated with stakeholders in accordance with workplace requirements
- 1.5 Equipment required for work is determined in accordance with work plan and workplace requirements
- 1.6 Work permits are determined in accordance with workplace requirements
- 1.7 Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.8 Operational personnel requirements are determined in accordance with workplace requirements
- 1.9 Liaison and communication issues with stakeholders are resolved
2 Develop and validate distribution and sub-transmission switching programs
- 2.1 Available resources are used to determine best outcomes, in accordance with workplace requirements
- 2.2 Distribution and sub-transmission switching programs are developed and validated in accordance with workplace requirements
- 2.3 Work plan is checked for compliance against technical advice, legislation, regulations, standards and codes of practice
- 2.4 Health and safety risks are identified and minimised or eliminated by using safety and control measures
- 2.5 Ongoing quality checks of work are undertaken in accordance with work plan and workplace requirements
3 Complete work and documentation
- 3.1 Completed work is checked for compliance against the work plan and workplace requirements
- 3.2 Work records, reports and documentation are completed, and appropriate personnel notified in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN58 | UETDRSO005 | Develop high voltage distribution and sub-transmission switching programs | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHY4 | UET60222 | Advanced Diploma of ESI - Power Systems | Qualification |