Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage installation, commissioning or modification of machines and equipment

Manage installation, commissioning or modification of machines and equipment

Unit of competency
National Code
MEM234031A
State Code
S8126
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/12/2011
State Implementation and Classification
Approved Date
29/08/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
29/08/2014
Nominal Hours
54
Description
This unit of competency covers the skills and knowledge required to provide the technical leadership role in the installation, commissioning or modification of machines and equipment. It includes interpreting manufacturer specifications, implications of relevant regulations, internal or external client brief, liaison with designers, and ensuring that team members are aware of technical and performance requirements.
Notes
Elements and Performance Criteria
1 Identify scope of machine installation, commissioning or modification task
  • 1.1 Examine machine and equipment drawings, manufacturer’s manuals and other technical data on machines and equipment
  • 1.2 Determine performance and production requirements expected from machines and equipment after installation, commissioning or modification
  • 1.3 Determine relevant regulatory requirements
  • 1.4 Inspect site and determine appropriateness of structural supports, ventilation, services, security and other critical requirements
  • 1.5 Determine mechanical, electrical, fabrication and machine control skills and task requirements
  • 1.6 Produce or review installation, commissioning or modification schedule
2 Brief team on requirements
  • 2.1 Distribute and discuss drawings, schedules, and major materials and equipment with team
  • 2.2 Arrange for request for further information (RFIs) with designers, where required
  • 2.3 Brief team on key compliance and risk factors, including regulatory, occupational health and safety (OHS) and environmental requirements
  • 2.4 Agree with team on critical control points and reporting requirements
3 Commence installation, commissioning or modification task
  • 3.1 Supervise machine and equipment shutdowns required for task
  • 3.2 Supervise unloading of any new machines, equipment and materials required for task
  • 3.3 Check and determine that supply of services to work are adequate for task commencement
  • 3.4 Ensure all tradespersons have correct drawings
4 Monitor progress and deal with contingencies
  • 4.1 Establish procedures to ensure assembly and connections are against drawing specifications
  • 4.2 Ensure electrical, fluid power, and control systems and circuits are consistent with specifications and regulations
  • 4.3 Identify problems and contingencies and establish and rectify root cause
5 Finalise installation, commissioning or modification
  • 5.1 Conduct final check to ensure installation, commissioning or modification is consistent with drawings, manufacturer manuals and any regulatory requirements
  • 5.2 Conduct test run of equipment
  • 5.3 Identify and correct any malfunctions or errors in required output
6 Conduct handover and finalise documentation
  • 6.1 Brief client and operators on machine or equipment operation after installation
  • 6.2 Prepare and submit any required reports on installation, commissioning or modification
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Installation, commissioning or modification
Installation, commissioning or modification refers to machinery and equipment projects that have the following features:
the performance of the whole machine or equipment must be verified against drawings, client brief and manufacturer specifications at the conclusion of the project
skills and knowledge above the trade level are required for planning and supervising the installation, commissioning or modification project
work is conducted against a formal design
RFIs
RFIs are formal queries to designers seeking clarifications or additional information to enable the installation, commissioning or modification project to proceed
Appropriate technical personnel and professionals
Appropriate technical and professional assistance may include:
technical support and advice relating to elements which have intrinsic dangers, such as:
high pressure
energised fluid vessels
high temperatures and heat energy capacity
wiring or devices with high current or voltages above extra low voltage
professional support for technologies, such as:
specialist electric motor drives and controllers
specialist materials, plastics, metal alloys and nano materials
special processes, foundry, alloy welding, heat treatment, sealing and fastening
professional services for:
finance, accounts and tax
insurance and legal
training and human resources (HR)
OHS, regulatory, sustainability and environmental issues
OHS, regulatory, sustainability and environmental issues may include:
OHS Acts and regulations
relevant standards
industry codes of practice
risk assessments
registration requirements
safe work practices
minimising ecological and environmental footprint of process, plant and product
maximising economic benefit of process plant and product to the organisation and the community
minimising the negative OHS impact on employees, community and customer
state and territory regulatory requirements
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently:
determine features of machines or equipment, OHS, regulatory and risk management requirements both before and after installation, commissioning or modification
lead a multi-disciplinary team
measure, model, calculate and analyse using software and validation techniques
analyse drawings and manufacturer specifications to determine machine and equipment systems and components
determine steps and processes needed for machine and equipment installation
determine steps and processes needed for machine and equipment commissioning
determine steps and processes needed for machine and equipment modification
innovate and create solutions to engineering-related contingencies
verify machine and equipment performance to specifications after installation, commissioning or modification
communicate, negotiate and review with stakeholders and client throughout installation, commissioning or modification process.
Context of and specific resources for assessment
This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is, the candidate is not in productive work, then a simulated working environment must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the MEM05 Metal and Engineering Training Package.
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application.
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Assessment may be in conjunction with assessment of other units of competency where required.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaced By
State Code National Code Title Type
OEU27 MEM234031 Manage installation, commissioning or modification of machines and equipment Unit of competency
State Code National Code Title Type
J482 MEM80112 Graduate Diploma of Engineering Qualification