Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate heat plant

Operate heat plant

Unit of competency
National Code
FWPCOT3232
State Code
AXL31
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
13/05/2016
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/10/2016
Nominal Hours
37
Description
This unit of competency describes the outcomes required to start up, operate and store an energy producing heat plant. The unit applies to heat plant operators in a timber processing plant setting and includes shutting down and cleaning equipment.No licensing, legislative, regulatory, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for operation
  • 1.1 Review operational order and where required check with appropriate personnel.
  • 1.2 Select appropriate personal protective equipment and check for operational effectiveness.
  • 1.3 Identify and set quantity of energy to be generated for allocated process.
  • 1.4 Plan heat generation in line with work order.
2. Operate and monitor heat plant
  • 2.1 Use equipment in line with organisational safety procedures, manufacturer’s instructions and environmental protection practices.
  • 2.2 Complete pre-operational safety and pre start-up checks to ensure operational effectiveness.
  • 2.3 Start plant and bring safely on line; communicate recent performance to appropriate personnel.
  • 2.4 Assess continued operation of heat plant against pre-operational checks, maintenance requirements and operating conditions.
  • 2.5 Monitor heat plant operation, diagnose status and adjust to maintain safe and efficient operation.
  • 2.6 Follow emergency shutdown procedures in cases of fire.
  • 2.7 Complete operating log, record fuel efficiency and report to appropriate personnel.
3. Shut down and store heat plant
  • 3.1 Follow organisational safety procedures to shut down equipment.
  • 3.2 Remove or replace valves and fittings in line with organisational safety procedures if required
  • 3.3 Maintain cleanliness of heat plant and plant room in line with environmental protection practices
  • 3.4 Select storage mode and store heat plant in line with organisational safety procedures.
  • 3.5 Record and report and equipment faults and maintenance requirements to appropriate personnel.
No information
No information
Replaces
State Code National Code Title Type
D5941 FPICOT3232B Operate heat plant Unit of competency
Replaced By
State Code National Code Title Type
OFD21 FWPCOT3333 Conduct heat plant operations Unit of competency
State Code National Code Title Type
BAM5 FWP30316 Certificate III in Sawmilling and Processing Qualification
BAL3 FWP30416 Certificate III in Wood Panel Products Qualification