Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare plans for pipe and duct fabrication
Prepare plans for pipe and duct fabrication
Unit of competency
National Code
MEM09217
MEM09217
State Code
OEU49
OEU49
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
039999 - Engineering And Related Technologies, N.e.c.
Original Release Date
19/04/2023
Nominal Hours
40
Description
This unit of competency defines the skills and knowledge required to prepare drawings and plans for pipe and duct fabrication and installation to Australian Standard (AS) 1100.101 Technical drawing - General principles and is primarily for those performing drafting work within the air conditioning industry.Critical dimensions and specifications are predetermined and drawings are prepared with or without the use of computer-aided design (CAD) systems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Access and interpret specifications
- 1.1 Follow standard operating procedures (SOPs) and comply with work health and safety (WHS) requirements at all times
- 1.2 Interpret project specifications and requirements for pipework, including layout, sizing and type of pipe and duct required
- 1.3 Determine implications and requirements for pipe fabrication and support
- 1.4 Access and interpret organisational and industry standards, information and catalogues to obtain required product specifications
2. Document pipe fabrication
- 2.1 Determine appropriate methods of joining and cutting pipe materials being used
- 2.2 Determine appropriate methods for supporting pipework materials being used
- 2.3 Document pipe fabrication requirements on plans
- 2.4 Document pipe support requirements on plans
- 2.5 Include instructions for electrolysis of dissimilar materials on plans
3. Document duct fabrication
- 3.1 Determine appropriate methods of joining and cutting duct materials being used
- 3.2 Determine appropriate methods for supporting duct work materials being used
- 3.3 Document duct fabrication requirements on plans
- 3.4 Document duct support requirements on plans
- 3.5 Include instructions for electrolysis of dissimilar materials on plans
4. Complete and store drawings
- 4.1 Complete drawings and associated technical information in accordance with project requirements and SOPs
- 4.2 Process drawings and associated documentation for approval in accordance with organisational requirements
- 4.3 Store drawings and associated documentation in accordance with SOPs
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE072 | MEM09217A | Prepare plans for pipe and duct fabrication | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIW7 | MEM50222 | Diploma of Engineering - Technical | Qualification |
| BIW9 | MEM40422 | Certificate IV in Engineering Drafting | Qualification |