Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Undertake local systems operations

Undertake local systems operations

Unit of competency
National Code
UEPOPS252
State Code
OAH21
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
31/10/2018
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
030717 - Plant And Machine Operations
Original Release Date
15/05/2019
Nominal Hours
27
Description
This unit involves the skills and knowledge required to operate power generating plant as a local systems operation, in conjunction with coordinated systems, under the control of appropriate authorised personnel. The operation, configuration and implementation of power generation systems and plant should be considered and reviewed when undertaking local systems operations. Competency in this unit requires the ability to plan and prepare work, operate plant and complete work. Individuals will, in general, work as an operator, in a power generation facility.Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare work
  • 1.1 Safety issues are identified, in accordance with workplace procedures, to comply with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and industry standards
  • 1.2 Work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
  • 1.3 Local system operations plant status is confirmed, in accordance with workplace procedures and instructions
  • 1.4 Preoperational checks are carried out on local system operations plant, in accordance with workplace procedures and instructions
2 Operate plant
  • 2.1 System components to be locally controlled are identified and operated, in accordance with workplace procedures and instructions
  • 2.2 Local system operations plant is operated within limits of its design specification and site requirements, in accordance with workplace procedures
  • 2.3 Local system operations plant is monitored, observed and tested, in accordance with workplace procedures, to detect deviations from normal operating conditions
3 Complete documentation
  • 3.1 Local system operations plant problems, movements, and status are reported, in accordance with workplace procedures
  • 3.2 Documentation is updated, in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WE325 UEPOPS252A Undertake local systems operations Unit of competency
Replaced By
State Code National Code Title Type
ODX94 UEPOPS145 Undertake local systems operations Unit of competency