Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Licence to operate a slewing mobile crane (up to 60 tonnes)

Licence to operate a slewing mobile crane (up to 60 tonnes)

Unit of competency
National Code
TLILIC0013
State Code
OAE43
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
2.00
Current Release Date
27/09/2019
State Implementation and Classification
Approved Date
04/01/2019
Field of Education
030717 - Plant And Machine Operations
Original Release Date
04/01/2019
Nominal Hours
70
Description
This unit specifies the skills and knowledge required to safely operate a slewing mobile crane with a Maximum Rated Capacity (MRC) up to 60 tonnes, in accordance with all relevant legislative responsibilities. Competence in this unit, does not in itself result in a High Risk Work Licence (HRWL) to operate this plant.A person undertaking this unit must hold: a current National HRWL to perform dogging or a current certification for a specific VET course for HRWL to perform dogging that has been issued by, or on behalf of a WHS Regulator.Slewing mobile crane means a mobile crane incorporating a boom or jib that can be slewed, but does not include:a front-end loader ora backhoe oran excavator orother earth moving equipment, when configured for crane operation.A person performing this work is required to hold a slewing mobile crane with an MRC up to 60 tonnes HRWL.This unit requires a person operating a slewing mobile crane with an MRC up to 60 tonnes to:plan for the work/taskprepare for the work/taskperform work/taskpack upLicensing/Regulatory InformationLegislative and regulatory requirements are applicable to this unit of competency. This unit is based on the licensing requirements of Part 4.5 of the Model Work Health and Safety (WHS) Regulations and meets Commonwealth, State and Territory HRWL requirements. The National Assessment Instrument (NAI) is the mandated assessment for the HRWL to operate the relevant licencing class as detailed in this unit.
Notes
Elements and Performance Criteria
1 Plan work/task
  • 1.1 Task requirements are identified from work orders or equivalent and a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance a with workplace procedures
  • 1.2 Work area operating surface is confirmed to determine ground suitability for operational use of mobile crane in accordance with lift plan, safe work and workplace/s procedures
  • 1.3 Mobile crane rated capacity (RC) and the lifting gear Working Load Limit (WLL)are established and suitable for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
  • 1.4 Appropriate paths for operating the mobile crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures
  • 1.5 Relevant hazard identification and risk elimination/control measures are applied and advised to associated personnel in accordance with workplace procedures
  • 1.6 Traffic management plan implementation is confirmed in accordance with workplace procedures
  • 1.7 Appropriate communication procedures are identified with associated personnel in accordance with workplace procedures
  • 1.8 All crane and lifting operations are confirmed to ensure relevant work area requirements are correct in accordance with a lift plan and workplace procedures
2 Prepare for work/task
  • 2.1 Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
  • 2.2 Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  • 2.3 Mobile crane is accessed safely in accordance with manufacturer requirements and safe work procedures
  • 2.4 Pre-start mobile crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  • 2.5 Mobile crane is set up correctly with any lifting gear and stabilised as per the lift plan in accordance with relevant manufacturer requirements including load chart/s and safe work procedures
  • 2.6 Counterweight/s are set up as required in accordance with the lift plan, relevant manufacturer requirements and safe work procedures
  • 2.7 Fly jib and/or luffing fly are set up as required in accordance with specific manufacturer requirements and safe work procedures
  • 2.8 Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  • 2.9 Crane logbook is checked to confirm current compliance, is correct for the crane type, is completed and signed and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  • 2.10 Weather and work environment conditions are assessed to determine any impact on mobile crane operations in accordance with manufacturer requirements and safe work procedures
3 Perform work/task
  • 3.1 Lifts are determined to be within the RC of the mobile crane in accordance with the load chart/s and lift plan
  • 3.2 Boom/jib and hook block is safely positioned over the load following directions from associated personnel in accordance with the lift plan and safe work procedures
  • 3.3 Main and/or auxiliary hook including any lifting gear, where required are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements
  • 3.4 Test lift is carried out in accordance with dogging and safe work procedures
  • 3.5 Loads are transferred using relevant crane movements and tag lines as required, in accordance with lift plan and safe work procedures
  • 3.6 Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures
  • 3.7 All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures
  • 3.8 Load is lowered and landed safely in accordance with lift plan and safe work procedures
  • 3.9 Lifting gear is positioned for safe disconnection from the load and crane is positioned for next task in accordance with lift plan and safe work procedures
4 Pack up
  • 4.1 Crane boom/jib, lifting gear and associated equipment is stowed and secured as required in accordance with manufacturer requirements and safe work procedures
  • 4.2 Crane fly jib and/or luffing fly and counterweight/s is removed to storage position and secured as required in accordance with manufacturer requirements and safe work procedures
  • 4.3 Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
  • 4.4 Outriggers, plates and/or packing are stowed and secured in accordance with manufacturer requirements and safe work procedures
  • 4.5 Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  • 4.6 Shut down crane checks are carried out in accordance with safe work procedures and manufacturer requirements
No information
No information
Replaces
State Code National Code Title Type
AWL60 TLILIC4009 Licence to operate a slewing mobile crane (up to 60 tonnes) Unit of competency
Replaced By
State Code National Code Title Type
ODP66 TLILIC0023 Licence to operate a slewing mobile crane (up to 60 tonnes) Unit of competency