Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install water pipe systems

Install water pipe systems

Unit of competency
National Code
CPCPWT3029A
State Code
WF973
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/02/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
72
Description
This unit of competency specifies the outcomes required to install and test water pipes larger than DN65, or large water services.
Notes
Elements and Performance Criteria
1 Plan and prepare.
  • 1.1 Work instructions and relevant information, including plans, specifications, quality requirements and operational details relevant to the tasks, are obtained, confirmed and applied to the allotted task.
  • 1.2 Work health and safety (WHS) requirements are obtained from the site safety plan and organisational policies and procedures, confirmed and applied to the allotted task.
  • 1.3 Signagerequirements are identified and obtained from project traffic management plan and traffic conditions and are implemented.
  • 1.4 Plant, tools and equipment selected to carry out tasks are consistent with requirements of the job, are checked for serviceability and any faults are rectified or reported.
  • 1.5 Environmental requirementsare identified from project environmental management plan, confirmed and applied to the allotted task.
2 Set out and excavate.
  • 2.1 Work area and materials are prepared to support efficient installation of the pipe work.
  • 2.2 Dewatering requirements are determined and applied.
  • 2.3 Location, alignment direction, level and grade of mains pipe system are determined from job drawings and specifications.
  • 2.4 Works are set out to specification.
  • 2.5 Plant operator is advised of excavation requirements and levels are monitored.
  • 2.6 Mains pipe system support mechanism is installed according to plans, specifications and standards in compliance with statutory and regulatory authorities’ requirements.
3 Install mains pipeline.
  • 3.1 Pipes are lowered and placed in position according to design specifications of mains pipe system.
  • 3.2 Pipes are joined according to manufacturer specifications using pipe joining methods.
  • 3.3 Pipes are placed and fittings, valves and flow control devices are fitted according to drawings, specifications and installation procedures.
  • 3.4 Alignment level and grade are checked continuously for conformance with design plans and specifications.
  • 3.5 Side support or overlay is positioned beside the pipes.
  • 3.6 Mains pipe system support structure is checked.
  • 3.7 Backfill procedure is monitored to ensure work is completed to specification, where specified.
  • 3.8 Sustainability principles and concepts are observed when preparing for and undertaking work process.
4 Test mains pipe system.
  • 4.1 Testingis performed to relevant authorities’ requirements as determined by specifications.
  • 4.2 Mains pipe system test procedures are performed, establishing pressurisation, functionality and serviceability.
  • 4.3 Test results are recorded and reported.
5 Clean up.
  • 5.1 Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
  • 5.2 Plant, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
MSDS
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements pertaining to the installation of mains pipe systems
relevant Australian standards
safe work procedures or equivalent relating to the installation of mains pipe systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.

Work health and safety is to be according to commonwealth, state and territory legislation and regulations, organisational safety policies and procedures, and project safety plan, and may include:
emergency procedures, which are to include:
emergency shutdown and stopping
extinguishing equipment for fires
organisational first aid requirements, including use of first aid equipment
evacuation
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards and risks associated with:
buildings
cuttings
electricity
embankments
excavations
hazardous materials and substances
other machines
personnel
restricted access barriers
structures
traffic control
trees
underground services
uneven and unstable terrain
work site visitors and the public
working in proximity to others
safe parking practices, including ensuring:
access ways are clear
equipment and machinery are:
away from overhangs and refuelling sites
safe distance from excavations
secured from unauthorised access or movement
use of tools and equipment
workplace environment and safety.

Signage may include:
barricades
highway traffic signs
signage for traffic control escort vehicles
site safety signage
temporary signage for benefit of motorists and pedestrians
traffic conditions signage.

Traffic conditions may include:
buildings
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas.

Tools and equipment may include:
crow bars
grinders
hammers
jointing equipment
levelling equipment
lifting equipment
oxy-acetylene equipment
saws
scaffolding
shovels.

Environmental requirements are to include:
clean-up management
dust and noise
organisational and project environmental management plan
vibration
waste management
water quality protection.

Materials may include:
backfill and bedding materials
concrete
pipes
other approved materials.

Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.

Mains pipe systems:
may include:
in-ground or above ground
pressurised mains water pipelines (booster system)
may be constructed from:
ductile iron cement lined (DICL)
polymer
steel and copper
other approved materials.

Pipe joining methods may include:
arc welded and mechanical jointed
rubber ring
solvent welded
other approved jointing methods.

Valves and flow control devices include:
air release valves
energy dissipaters
flow control valves
non-return valves
pressure control valves
stop valves.

Installation procedures:
are to include:
bedding down pipes
checking alignment, level and grade
positioning pipes
selecting size, type and material of pipe
may include:
repair work
bedding materials, including aggregate and sand
support systems, which may include:
bedding for in-ground trenches
concrete shoulders for above ground pipes.

Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include:
selecting appropriate material to ensure minimal environmental impact
efficient use and recycling of material
efficient energy and water use
disposing of waste material to ensure minimal environmental impact.

Testing procedures may include:
air
ovality
pressure
tolerance
visual straightness
water.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
applying sustainability principles and concepts
locating, interpreting and applying relevant information, standards and specifications
complying with site safety plan, WHS regulations and state and territory legislation applicable to workplace operations
complying with organisational policies and procedures, including quality requirements
given the plans and specifications, installing six metres of DN100 mains pressure pipe system which is to include a change of direction or tee junction
installing a mains pipe system which, as a minimum, includes two materials and one isolation valve
safe and effective operational use of tools, plant and equipment
communicating and working effectively and safely with others.

Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Guidance information for assessment
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
D7507 CPCPWT3019A Install water pipe systems Unit of competency
Replaced By
State Code National Code Title Type
OCM58 CPCPWT3029 Install water pipe systems Unit of competency