Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan and monitor timber treatment plant operations

Plan and monitor timber treatment plant operations

Unit of competency
National Code
FPISAW4201B
State Code
D6086
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/05/2011
State Implementation and Classification
Approved Date
25/06/2012
Field of Education
030305 - Materials Engineering
Original Release Date
25/06/2012
Nominal Hours
30
Description
This unit describes the outcomes required to oversee and plan timber treatment plant procedures, monitor performance, review and modify treatment operations and assess technical developments. This unit includes provision for continuous improvement and application of cost effective measuresGeneral workplace legislative and regulatory requirements apply to this unit; however there are no specific licensing or certification requirements at the time of publicationThis unit replaces FPISAW4201A Plan and monitor timber treatment plant operations
Notes
Elements and Performance Criteria
1. Plan treatment plant procedures
  • 1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to planning and monitoring timber treatment plant operations are identified and followed
  • 1.2. Variations in timber characteristics are assessed and moisture content registered
  • 1.3. Timber treatment schedules are produced and applied in line with site procedures and environmental requirements
  • 1.4. Water management procedures are planned and scheduled
  • 1.5. Waste minimisation and control measures are planned and prescribed
  • 1.6. Communication with others is established and maintained in line with OHS requirements
2. Monitor treatment plant performance
  • 2.1. Charge sheets are checked and interpreted to ensure accuracy
  • 2.2. Reconciliation statements are checked and interpreted to ensure accuracy
  • 2.3. Process trends are checked and analysed for optimum performance
  • 2.4. Treatment operations and output are monitored to record possible process improvements and to ensure maximum cost effectiveness
  • 2.5. Timber with sub-standard treatment results is disposed of in line with site procedures and environmental requirements
  • 2.6. Treatment operations, major problems and equipment faults are investigated, recorded and reported in line with site requirements
3. Modify operations and assess technical developments
  • 3.1. Modifications are made to schedules to ensure optimum performance
  • 3.2. Treatment improvement modifications are documented and communicated in line with site procedures
  • 3.3. Developments in treatment processes and related technology are diagnosed for possible improvements
  • 3.4. Technical developments are analysed and assessed for potential incorporation into existing plant operations and procedures
  • 3.5. Proposed developments are authorised, trialled, documented and introduced into site operations
  • 3.6. Material from unsuccessful trials is disposed of in line with site procedures and environmental requirements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHS requirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Moisture content
is the amount of moisture maintained in timber or timber products after kiln drying to avoid cracking and deforming
Timber treatment
is the process of impregnating preservative solution filled with chemicals into the timber to provide it with a durable resistance to weather and insect attack
and may include:
full cell
modified cell
empty cell
double vacuum
dip diffusion
vat and sprays
other processes developed by the enterprise
Water management may include:
stormwater
contaminated water
bore water
recycled dam water
town mains water
Waste minimisation may include:
measures to control chemical waste
wood residues
packaging residues
debris
soil
other foreign matter
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice
body language
Charge sheets are to include:
records of the treatment plant charge
amount of power and energy developed and used
Reconciliation statements are to include:
statements reflecting chemical usage and cost
treatment times for cycles
breakdown losses
energy costs
modification expenses
Process trends are to include:
mapping processing conditions to establish trends
using this information for modifications
Disposing of may include:
recycling sub-standard timber/unsuccessful trial material
re-using sub-standard timber/unsuccessful trial material
Records and reports may include:
planning and monitoring outcomes
reconciliations
charge sheets
material movement
despatch outcomes
storage locations
quality outcomes
hazards
incidents
equipment malfunctions
and may be:
manual
using a computer-based system or another appropriate organisational communication system
Technical developments may include:
less toxic chemicals
improved methods of chemical penetration
improved chemical formulation
improved process methods
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently plan and monitor timber treatment plant operations in line with organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to, and satisfy, all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to planning and monitoring timber treatment plant operations
following organisational policies and procedures relevant to planning and monitoring timber treatment plant operations
planning and monitoring of timber treatment plant operations for the enterprise
modifying timber treatment plant operations for the enterprise
coordinating personnel to follow planning, communications and scheduling for timber treatment plant operations
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaced By
State Code National Code Title Type
AXJ77 FWPSAW4201 Plan and monitor timber treatment plant operations Unit of competency
State Code National Code Title Type
J478 FPI50111 Diploma of Forest and Forest Products Qualification
J475 FPI40211 Certificate IV in Timber Processing Qualification