Unit of competency Outline

Date retreived
22/07/2026 12:46 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply structural principles to the planning of the demolition of a structure

Apply structural principles to the planning of the demolition of a structure

Unit of competency
National Code
CPCCDE4005
State Code
OCQ85
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030903 - Structural Engineering
Original Release Date
01/06/2021
Nominal Hours
35
Description
This unit of competency specifies the skills and knowledge required to apply structural principles when planning demolition, using conventional methods, of structures. This unit of competency supports the needs of site managers, forepersons and other managers in the building and construction or demolition industry responsible for effecting a demolition plan. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001Prepare to work safely in the construction industrymeets this requirement.Licensing, legislative, regulatory or certification requirements apply to demolition work in different states and territories. Candidates are advised to consult with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1 Analyse the structural integrity of demolition project.
  • 1.1 Analyse integrity of structure from project plans and specifications, building standards and codes.
  • 1.2 Conduct pre-commencement site inspection to confirm analysis.
  • 1.3 Assess project for compliance with workplace safety and environmental requirements.
  • 1.4 Confirm analysis with relevant industry professionals.
2 Apply structural principles to the planning of demolition project.
  • 2.1 Identify main structural principles that apply to the intended demolition.
  • 2.2 In conjunction with related industry professionals, confirm the structural performance characteristics of slabs, beams, columns and retaining walls and apply these to the planning of the demolition project.
  • 2.3 Confirm properties and behaviours of structural components and then possible reactions to demolition, using standard industry formulas and performance comparisons.
3 Evaluate worksite prior to demolition.
  • 3.1 Implement processes to analyse stability of soils and capacity of the site to support the demolition loads.
  • 3.2 Establish processes for demolishing wall systems and wall cladding systems in compliance with relevant Australian Standards and codes.
  • 3.3 Evaluate structural integrity of the roof and roof cladding system in preparation for demolition.
  • 3.4 Complete relevant documentation in accordance with workplace requirements.
No information
No information
No information
State Code National Code Title Type
BGC5 CPC41020 Certificate IV in Demolition Qualification