Unit of competency Outline
Date retreived
22/07/2026 7:58 PM AWST
22/07/2026 7:58 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install pre-cast decorative mouldings
Install pre-cast decorative mouldings
Unit of competency
National Code
CPCCSP3005
CPCCSP3005
State Code
OCP49
OCP49
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040317 - Plastering
Original Release Date
01/06/2021
Nominal Hours
40
Description
This unit specifies the skills and knowledge required to install pre-cast decorative mouldings to masonry, plasterboard and cement sheets. It includes measuring, cutting and fixing of cast plaster and finishing junctions for painting. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them, without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare to install pre-cast decorative mouldings.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
- 1.3 Select and use personal protective equipment (PPE) for each stage of the task.
- 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5 Select tools and equipment, check for serviceability and report any faults.
- 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Install pre-cast moulded archway.
- 2.1 Check substrate and set out and cut archway profile to specifications.
- 2.2 Cut, position and fix timber arch soffit templates.
- 2.3 Fix infill moulding to arch soffit and reveals of opening.
- 2.4 Stop arch to specifications and level of finish.
3 Fix plaster panelled ceiling.
- 3.1 Set out, position, fix and space ceiling battens for cornice margins and flush mounted panels.
- 3.2 Locate, level and line-up, and fix panels on ceiling.
- 3.3 Finish jointing to meet ceiling plastering requirements.
- 3.4 Sand and clean surface in preparation for painting.
4 Fix ornamental mouldings.
- 4.1 Measure and cut ornamental mouldings to specification.
- 4.2 Select fastening method for moulding.
- 4.3 Set out and mark position of ornamental moulding.
- 4.4 Position and fix moulding straight and level.
- 4.5 Finish mouldings, including straight stoppings and mitres to specification.
5 Clean up.
- 5.1 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
- 5.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9548 | CPCCSP3005A | Install pre-cast decorative mouldings | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGD3 | CPC31020 | Certificate III in Solid Plastering | Qualification |
| BGD5 | CPC31220 | Certificate III in Wall and Ceiling Lining | Qualification |