Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop and review surface water management plan
Develop and review surface water management plan
Unit of competency
National Code
NWP517B
NWP517B
State Code
D1970
D1970
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
06/11/2014
Nominal Hours
120
Description
This unit of competency describes the outcomes required to develop and review a surface water management plan to ensure environmental considerations are met and source of supply is maintained.
Notes
Elements and Performance Criteria
1Plan and prepare for management of surface water flows and quality.
- 1.1 Identify and interpret surface water flow requirements.
- 1.2 Identify and interpret water flow, quality and quantity requirements, including release.
- 1.3 Identify and interpret historic source water flow and system capacity information.
- 1.4 Identify and interpret environmental flows that impact on water flows and quality.
- 1.5 Identify and interpret environmental factors that impact on surface water.
- 1.6 Identify, interpret and review the current status of resource and operational protocols.
2Develop the surface water management plan.
- 2.1 Identify and interpret surface water management requirements.
- 2.2 Identify, interpret and validate stakeholder requirements that impact on surface water.
- 2.3 Develop a surface water management plan.
3Review the surface water management plan.
- 3.1 Analyse and report deviations from planned performance measures.
- 3.2 Review objectives of the management and implementation plans.
- 3.3 Review parameters for water usage and quality through monitoring and testing programs.
- 3.4 Make recommendations for changes to plan objectives and procedures, and usage and quality parameters.
- 3.5 Provide advice and guidance to water users and stakeholders.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Surface water sources may include:
dams
reservoirs
weirs
rivers
lakes
creeks and streams
wetlands
off stream storage
catchment areas
storage tanks
Water flow, quality and quantity requirements may be influenced by factors including:
usage and environment allocations
licenses
legislation
enterprise policies
cost benefit analysis
Historic source water flow information may include:
hydrological information
previous monitoring studies
previous risk assessments
geological data
hydro-geological data
land use studies
environmental management studies
anecdotal information from land owners
Environmental factors that impact on surface water may include:
environmental flow requirements
catchment usage and management
weather and climate
rainfall run-off
chemicals
salinity
nutrients
reservoir operations
natural events
The development of a surface water management plan may include:
setting targets and objectives for quantity
quality
stakeholders
future use
Monitoring and testing programs may include:
resource yields
resource status
flow rates
testing procedures
testing medium
testing frequency
sampling locations
testing variables
land use changes
Users and stakeholders may include:
water consumers
government
water authorities
environmental departments
recreational users of the area
interest groups
industry
extractive industry
Surface water sources may include:
dams
reservoirs
weirs
rivers
lakes
creeks and streams
wetlands
off stream storage
catchment areas
storage tanks
Water flow, quality and quantity requirements may be influenced by factors including:
usage and environment allocations
licenses
legislation
enterprise policies
cost benefit analysis
Historic source water flow information may include:
hydrological information
previous monitoring studies
previous risk assessments
geological data
hydro-geological data
land use studies
environmental management studies
anecdotal information from land owners
Environmental factors that impact on surface water may include:
environmental flow requirements
catchment usage and management
weather and climate
rainfall run-off
chemicals
salinity
nutrients
reservoir operations
natural events
The development of a surface water management plan may include:
setting targets and objectives for quantity
quality
stakeholders
future use
Monitoring and testing programs may include:
resource yields
resource status
flow rates
testing procedures
testing medium
testing frequency
sampling locations
testing variables
land use changes
Users and stakeholders may include:
water consumers
government
water authorities
environmental departments
recreational users of the area
interest groups
industry
extractive industry
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to develop and review a surface water management plan to ensure environmental considerations are met and source of supply is maintained including:
gathering, interpreting and synthesising information (including historical data, current legislation and standards, stakeholder views and monitoring and test results) to underpin the sound development of the surface water management plan
consulting widely and effectively
developing effective surface water management plans that address the water organisation's objectives and requirements
using data from testing and other monitoring arrangements to track the performance of the surface water management plan and inform the review of the plan
preparing reports and recommendations for changes to the objectives of the management plan and its implementation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to develop and review a surface water management plan to ensure environmental considerations are met and source of supply is maintained including:
gathering, interpreting and synthesising information (including historical data, current legislation and standards, stakeholder views and monitoring and test results) to underpin the sound development of the surface water management plan
consulting widely and effectively
developing effective surface water management plans that address the water organisation's objectives and requirements
using data from testing and other monitoring arrangements to track the performance of the surface water management plan and inform the review of the plan
preparing reports and recommendations for changes to the objectives of the management plan and its implementation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVY91 | NWPIRR062 | Develop and review irrigation system management plan | Unit of competency |
| AVY90 | NWPIRR063 | Develop and review surface water management plan | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D523 | AHC51110 | Diploma of Conservation and Land Management | Qualification |
| D247 | NWP50107 | Diploma of Water Operations | Qualification |