Unit of competency Outline
Date retreived
22/07/2026 8:55 AM AWST
22/07/2026 8:55 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install linoleum floor coverings
Install linoleum floor coverings
Unit of competency
National Code
MSFFL3012
MSFFL3012
State Code
WI369
WI369
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
40
Description
This unit of competency covers installing linoleum floor coverings to domestic and commercial installations using templating and scribing methods.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare for installation
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing linoleum floor coverings are verified and complied with
- 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Sub-floor condition is assessed for suitability for installation of linoleum floor coverings
- 1.4 Suitable adhesives, trims and accessories are selected
- 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 1.6 Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
2 Set out materials
- 2.1 Linoleum to be installed is checked against work order
- 2.2 Linoleum floor coverings are acclimatised according to manufacturer recommendations
- 2.3 Linoleum floor coverings for fixing are organised and used in accordance with relevant safety management requirements
- 2.4 Working lines and starting point are established
- 2.5 Soft underlay, if required, is cut to specification
- 2.6 Pre-form fillet is set out, cut and fitted, if required
3 Cut materials
- 3.1 Linoleum floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
- 3.2 Linoleum floor coverings are accurately and clearly marked for cutting
- 3.3 Linoleum floor coverings are cut to required pattern and shape with minimum waste of materials
4 Lay linoleum
- 4.1 Instructions and sequence for laying and fixing are followed
- 4.2 Materials for welding and fixing are organised and used in accordance with relevant safety management requirements
- 4.3 Welding and fixing methods and equipment are used following manufacturer instructions
- 4.4 Resilient skirting, reducer and edge strips are set-out and installed, as required
- 4.5 Completed installation is checked for flaws in installation and materials and faults rectified
5 Complete housekeeping
- 5.1 Unused materials are stored or recycled as required
- 5.2 Tools and equipment are cleaned and stored appropriately
- 5.3 Work area is cleaned and rubbish disposed of appropriately
- 5.4 Workplace documentation is completed
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ64 | MSFFL3066 | Install linoleum floor coverings | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |