Unit of competency Outline
Date retreived
22/07/2026 3:48 PM AWST
22/07/2026 3:48 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform routine maintenance on a vessel up to 24 metres
Perform routine maintenance on a vessel up to 24 metres
Unit of competency
National Code
MARB029
MARB029
State Code
OAB88
OAB88
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
06/12/2018
Field of Education
031701 - Maritime Engineering
Original Release Date
06/12/2018
Nominal Hours
36
Description
Notes
Elements and Performance Criteria
1 Plan maintenance tasks
- 1.1 Planned maintenance system is accessed to establish maintenance requirements for vessel
- 1.2 Maintenance tasks are proposed and prioritised in conjunction with others involved in or affected by the maintenance work
- 1.3 Resource requirements are identified and allocated to ensure efficient completion of tasks
- 1.4 Maintenance tasks to be performed are recorded in a maintenance schedule according to organisational procedures
2 Perform basic deck maintenance
- 2.1 Deck surfaces are checked according to planned maintenance system
- 2.2 Deterioration or corrosion of vessel deck surfaces is identified and appropriate maintenance action is carried out according to planned maintenance system
- 2.3 Minor faults and imperfections in paint surfaces are repaired according to organisational procedures
- 2.4 Weathered surfaces are restored using cleaners and liquid abrasives according to manufacturer instructions and organisational procedures
- 2.5 Tools and equipment are used correctly and safely
- 2.6 Maintenance materials are obtained, prepared and applied according to organisational procedures and manufacturer instructions
3 Carry out cleaning activities
- 3.1 Area to be cleaned is prepared and hazards are identified
- 3.2 Work area is barricaded or warning signs provided, as appropriate, to reduce risk to other crew members
- 3.3 Correct chemicals and cleaning agents are selected and applied according to manufacturer instructions and work health and safety (WHS)/occupational health and safety (OHS) requirements
- 3.4 Equipment is used correctly and safely
- 3.5 Cleaning tasks are completed according to organisational procedures and manufacturer instructions
4 Prepare and paint surfaces
- 4.1 Suitable personal protective clothing is selected and used according to WHS/OHS requirements
- 4.2 Surfaces are prepared using correct equipment
- 4.3 Rust remover, rust converter and undercoats are applied according to manufacturer specifications
- 4.4 Paints are mixed in correct proportions according to manufacturer specifications
- 4.5 Paint is applied using appropriate application equipment
5 Carry out routine maintenance of deck fittings, equipment and systems
- 5.1 Fittings and equipment are inspected and inspection results are compared with manufacturer specifications
- 5.2 Maintenance tasks are carried out to specifications
- 5.3 Mechanical equipment and system components are checked with appropriate instruments
- 5.4 Faulty items or components are identified and maintenance procedures selected
- 5.5 Unserviceable equipment is tagged and faults are identified according to organisational procedures
6 Repair or replace faulty fittings and equipment
- 6.1 Fittings and equipment are safely isolated according to regulations and WHS/OHS requirements
- 6.2 Faulty fittings or equipment are removed using appropriate tools, equipment and procedures
- 6.3 Replaceable items are selected or serviceable items are fitted according to manufacturer specifications
- 6.4 Adjustments are made to fittings or equipment to comply with specifications
- 6.5 Operational check is carried out to ensure compliance with manufacturer specifications
- 6.6 Maintenance report is completed according to organisational procedures
7 Supervise crew in completing maintenance tasks
- 7.1 Workload is organised in order of priority according to planned maintenance system
- 7.2 Maintenance tasks are allocated to appropriate crew members with consideration of individual experience and qualifications
- 7.3 Crew members are clearly briefed on their responsibility and maintenance tasks and WHS/OHS requirements
- 7.4 Guidance is provided appropriate to maintenance task and individual experience
- 7.5 Completed work is checked to ensure maintenance is performed according to organisational procedures
8 Clean up
- 8.1 Work area is cleared and cleaned for serviceable condition
- 8.2 Materials are disposed of or recycled according to legislative and organisational requirements
- 8.3 Tools and equipment are cleaned, checked and stored according to organisational procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH797 | MARB004 | Perform routine maintenance on a vessel up to 24 metres | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BJZ1 | MAR30924 | Certificate III in Maritime Operations | Qualification |
| BHC9 | MAR31021 | Certificate III in Maritime Operations (Master Inland Waters) | Qualification |
| BDU1 | MAR31018 | Certificate III in Maritime Operations (Master Inland Waters) | Qualification |
| BHD2 | MAR30921 | Certificate III in Maritime Operations (Master up to 24 metres Near Coastal) | Qualification |
| BDU4 | MAR30918 | Certificate III in Maritime Operations (Master up to 24 metres Near Coastal) | Qualification |