Unit of competency Outline
Date retreived
22/07/2026 2:36 PM AWST
22/07/2026 2:36 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Load and unload plant
Load and unload plant
Unit of competency
National Code
RIIHAN308D
RIIHAN308D
State Code
WH314
WH314
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
27/05/2014
Nominal Hours
16
Description
Load and unload plant in the Resources and Infrastructure Industries.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to load and unload plant
- 1.1 Access, interpret and apply load handling documentation and ensure compliance the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear personal protective equipment appropriate for work activities
- 1.5 Identify, obtain and implement signage and barriers and ensure the loading/unloading site is made safe and isolated from general traffic flow
2. Load the plant
- 2.1 Confirm the dimensions and capacity of the float/trailer to safely carry the plant item
- 2.2 Select tools and loading equipment, check for serviceability/faults and rectify or report, verbally or in writing, prior to commencement
- 2.3 Confirm preparation of the plant for transportation has been completed
- 2.4 Place and secure loading aids
- 2.5 Confirm loading procedure with operator and/or guide before loading commences
- 2.6 Move the plant item onto the trailer/float and halt at the designated position
3. Unload the plant
- 3.1 Confirm the unloading procedure with operator and/or guide before unloading commences
- 3.2 Place and secure unloading aids, including ramps, in accordance with the trailer/float specifications
- 3.3 Slacken securing devices and remove in a sequence which optimises safety
- 3.4 Move the plant item off the trailer/float and halt at the designated position
- 3.5 Stow loading aids including ramps, bridging materials and securing devices
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB284 | RIIHAN308A | Load and unload plant | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWB89 | RIIHAN308E | Load and unload plant | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J664 | RII30813 | Certificate III in Civil Construction Plant Operations | Qualification |