Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Synchronise plant and equipment

Synchronise plant and equipment

Unit of competency
National Code
AURKTA001
State Code
AXC86
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
14/04/2016
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
13/07/2016
Nominal Hours
30
Description
This unit describes the performance outcomes required to synchronise plant and equipment. It involves preparing for the task, selecting the correct synchronising procedure, carrying out the synchronisation, performing post-synchronising testing, and completing workplace processes and documentation.It applies to those working in the automotive service and repair industry. The plant and equipment include those of agricultural machinery or mobile plant machinery.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare to undertake synchronising operations
  • 1.1 Job requirements are determined according to workplace instructions
  • 1.2 Synchronisation procedures and information are sourced and interpreted
  • 1.3 Options for synchronisation are analysed and those most appropriate to the circumstances are selected and prepared
  • 1.4 Hazards associated with the work are identified and risks are managed
  • 1.5 Synchronisation tools and equipment are selected and checked for serviceability
  • 1.6 Technical and calibration requirements for synchronisation are sourced, and support equipment is identified and prepared
2. Conduct synchronising operations
  • 2.1 Synchronising procedures are carried out according to manufacturer specifications, workplace procedures, and safety and environmental requirements
  • 2.2 Synchronising documentation is completed and reported according to workplace procedures
3. Analyse results
  • 3.1 Operational tests are carried out and results are compared with manufacturer specifications
  • 3.2 Results are documented and reported according to workplace procedures
4. Complete work processes
  • 4.1 Final inspection is made to ensure work is to workplace expectations and plant and equipment are presented ready for use, including protective guards, safety features and cowlings
  • 4.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
  • 4.3 Tools and equipment are checked and stored according to workplace procedures
  • 4.4 Workplace documentation is processed according to workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WF195 AURKTA3001 Synchronise plant and equipment Unit of competency