Unit of competency Outline
Date retreived
22/07/2026 9:08 PM AWST
22/07/2026 9:08 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Identify and document services required to support fitted furniture designs
Identify and document services required to support fitted furniture designs
Unit of competency
National Code
MSFKB4003
MSFKB4003
State Code
WI566
WI566
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030113 - Cabinet Making
Original Release Date
20/06/2014
Nominal Hours
60
Description
This unit of competency covers assessing available services and determining service requirements to achieve new fitted furniture design proposals, such as those for a kitchen or bathroom application.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking kitchen and bathroom work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify and document available services
- 1.1 Access to work area is arranged with client
- 1.2 On-site work health and safety (WHS) procedures are followed
- 1.3 Plumbing, water outlets and drainage features are located and documented on site diagrams or plans
- 1.4 Electrical and data outlets are located and documented on site diagrams or plans
- 1.5 Location and type of lighting sources are located and documented on site diagrams or plans
- 1.6 Type and capacity of services are identified and details documented
- 1.7 Measurements are taken to inform layout documentation
- 1.8 Industry symbols and protocols are used to document information about services
2 Examine implications of services on design
- 2.1 Design brief, drawings and plans are examined to determine intentions or options for services
- 2.2 Details obtained from site are assessed against design information
- 2.3 Appliances identified in the design brief are identified and implications on services examined
- 2.4 Compliance issues relating to the location of services are identified
- 2.5 Implications of current services on design are determined
3 Determine and document lighting and electrical system layout
- 3.1 Requirements of the lighting and electrical system layout are ascertained from the design brief
- 3.2 Lighting is assessed for effect and suitability to functional and ambience requirements
- 3.3 Performance and characteristics required of electrical products are assessed and reviewed
- 3.4 Environmental considerations are analysed in respect of the lighting and electrical system layout
- 3.5 Ergonomic, anthropometric and proxemic principles are assessed in respect of the lighting and electrical system layout and the intended products
- 3.6 Costs associated with purchasing and obtaining the products are analysed and documented
- 3.7 Electrical contractors are consulted as required to confirm implications on design
- 3.8 Lighting and electrical system layout is determined to meet the design brief
4 Determine and document plumbing system layout
- 4.1 Requirements of the plumbing system are ascertained from the design brief
- 4.2 Performance and characteristics required of plumbing products are assessed and reviewed
- 4.3 Gas requirements are determined and included in system layout
- 4.4 Environmental considerations are analysed in respect of the plumbing system layout
- 4.5 Ergonomic, anthropometric and proxemic principles are assessed in respect of the plumbing system layout and the intended products
- 4.6 Costs associated with purchasing and obtaining the products are analysed and documented
- 4.7 Plumbing contractors are consulted as required to confirm implications on design
- 4.8 Plumbing layout is determined to meet the design brief
5 Complete layout documentation
- 5.1 Sketches and drawings are completed to identify the layout of electrical and lighting system and products
- 5.2 Sketches and drawings are completed to identify the layout of plumbing system and products
- 5.3 Sketches and drawings are completed to industry standards
- 5.4 Specifications are documented according to industry standards
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WA628 | LMFKB4003A | Identify and document services required to support fitted furniture designs | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAI51 | MSFKB4013 | Document residential building services | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J743 | MSF40313 | Certificate IV in Design of Kitchens, Bathrooms and Interior Spaces | Qualification |