Unit of competency Outline
Date retreived
22/07/2026 9:19 PM AWST
22/07/2026 9:19 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Interpret irrigation plans and drawings
Interpret irrigation plans and drawings
Unit of competency
National Code
AHCIRG315
AHCIRG315
State Code
BAO83
BAO83
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
45
Description
This unit of competency describes the skills and knowledge required to read and interpret plans and drawings applicable to installing irrigation systems.It applies to individuals who take responsibility for own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources. All work is carried out to comply with workplace procedures.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Apply commonly used symbols and abbreviations
- 1.1 Identify, understand and apply commonly used symbols and abbreviations on plans
- 1.2 Identify, understand and apply common irrigation terms used on plans
- 1.3 Identify key features of irrigation plans, elevations and sections
- 1.4 Identify scale, elevations and sections from drawings
2. Locate and identify key features on a site plan
- 2.1 Identify irrigation site from location drawings
- 2.2 Identify true north and system orientation from details provided on site plan
- 2.3 Identify key features of site plan
3. Mark out and peg the site from a plan
- 3.1 Mark boundaries of the site
- 3.2 Identify existing irrigation infrastructure on the site
- 3.3 Identify electricity and communications infrastructure on the site plan, mark out and implement safety procedures
- 3.4 Peg out pipelines and earthworks identified on the plan
4. Identify required components for installation
- 4.1 Annotate required pipeline components from plans and drawings
- 4.2 Annotate water supply, distribution and delivery components from plans and drawings
- 4.3 Make provision for receival and storage of materials on site
- 4.4 Confirm installation requirements and details of plans and drawings with supervisor
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE021 | AHCIRG315A | Interpret irrigation plans and drawings | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBJ87 | AHCIRG342 | Interpret irrigation plans and drawings | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCV7 | AHC32416 | Certificate III in Irrigation | Qualification |