Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up and place LV electrical apparatus and associated circuits into service

Set up and place LV electrical apparatus and associated circuits into service

Unit of competency
National Code
UEEEL0072
State Code
OCB33
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/11/2024
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to set up and place low voltage (LV) electrical apparatus and associated circuits into service.It includes preparing and setting up electrical apparatus and associated controls, and completing mandatory documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to set up electrical apparatus and associated controls
  • 1.1 WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 WHS/OHS risk control measures and procedures in preparation for the work are followed
  • 1.3 WHS/OHS hazards not previously identified are noted on job safety assessment, risks assessed and risk control measures implemented
  • 1.4 Work is appropriately sequenced in accordance with workplace procedures
  • 1.5 Appropriate person/s is consulted to ensure the work is coordinated effectively with others
  • 1.6 Location of electrical apparatus and controls is determined from site inspection and/or job specifications and diagrams
  • 1.7 Control settings and operating parameters are determined from job specifications and in accordance with workplace procedures
  • 1.8 Tools, equipment and testing devices needed to commission the system are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.9 Checks are undertaken to ensure all components are in place and secure in accordance with workplace procedures and relevant industry standards
  • 1.10 Need to inspect, test and measure live electrical work and operating system is determined in accordance with WHS/OHS requirements and workplace procedures
2 Set up electrical apparatus and associated controls
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 2.2 Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.3 Electrical apparatus and associated controls are adjusted to the required settings
  • 2.4 Testing/measuring devices are used to observe the operation of electrical apparatus and adjustments of controls, as required
  • 2.5 Methods for dealing with unplanned events are dealt with in accordance with workplace procedures and safe work practices
  • 2.6 Set-up is conducted efficiently without waste of materials, services, damage to apparatus or the environment using sustainable energy practices
3 Complete documentation
  • 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3 Results of work and final operating parameters are documented and appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WC506 UEENEEG162A Set up and place LV electrical apparatus and associated circuits into service Unit of competency