Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct road construction paver screeding operations
Conduct road construction paver screeding operations
Unit of competency
National Code
RIICRC305E
RIICRC305E
State Code
OCX26
OCX26
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
18/06/2021
Nominal Hours
48
Description
This unit describes the skills and knowledge required to conduct road construction paver screeding operations in civil construction, including setting up and operating paver screeds across different road surface and material types.It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to conduct road construction paver screeding operations
- 1.1 Obtain, interpret, clarify and confirm work requirements
- 1.2 Access, interpret and apply road construction paver screeding operations documentation and confirm work activity is compliant
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Identify, obtain, confirm and implement signage requirements
- 1.6 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.7 Survey work site and confirm ease of access and safe movement of materials
2. Set up paver screed
- 2.1 Set equipment to specified levels to lay material according to job requirements
- 2.2 Set electronic equipment to check level according to job requirements
- 2.3 Set screed controls according to job requirements
3. Operate paver screed
- 3.1 Identify site hazards associated with road construction paver screeding operations and implement the requirements, controls to minimise risks
- 3.2 Operate paver screed and adjust as required to meet job requirements
- 3.3 Identify and rectify faults in mat according to job requirements
- 3.4 Monitor work of paver attendants and rollers and advise as required to meet job requirements
- 3.5 Maintain communication with paver operator and monitor progress of job
- 3.6 Notify paver operator of issues with the base as required
- 3.7 Perform operator maintenance according to manufacturer specifications
4. Conduct clean-up activities
- 4.1 Clean work area and dispose of or recycle materials according to site requirements
- 4.2 Clean, check, maintain and store plant, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH121 | RIICRC305D | Conduct road construction paver screeding operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |