Unit of competency Outline
Date retreived
23/07/2026 5:05 AM AWST
23/07/2026 5:05 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Provide leadership in hydrometric network planning and water resource management
Provide leadership in hydrometric network planning and water resource management
Unit of competency
National Code
NWP705A
NWP705A
State Code
D1995
D1995
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
080315 - Project Management
Original Release Date
06/11/2014
Nominal Hours
120
Description
This unit of competency describes the outcomes required to provide leadership to hydrometric network planning and water resource management. A detailed understanding of the processes required to collect, analyse, store and report data together with the use of this information to inform effective policy development are essential to performance.
Notes
Elements and Performance Criteria
1 Review and plan hydrometric network and data management processes
- 1.1 Review hydrometric network and water resource management planning and policy requirements of the organisation in consultation with senior management.
- 1.2 Review and analyse data required to support hydrometric network planning and water resource management processes within the organisation.
- 1.3 Review processes to collect, analyse, store and report hydrometric network data to ensure they support organisation's short, medium and long-term planning needs.
- 1.4 Identify, plan, manage and report resource requirements to meet hydrometric network data management needs of the organisation.
- 1.5 Identify future and extended uses of data and monitoring networks as part of planning process and to ensure most effective use of data and network.
2 Manage provision of quality data
- 2.1 Communicate holistic purpose and eventual use of data to stakeholders and staff.
- 2.2 Review work procedures and documentation used to support collection, analysis, storage and reporting of hydrometric network data and communicate outcomes to staff.
- 2.3 Use advanced mathematical and technical processes to support planning and operation of hydrometric network monitoring and testing regimes.
- 2.4 Set monitoring and testing priorities.
- 2.5 Prepare reports in a format suitable to support decision-making and planning within organisation.
- 2.6 Plan and ensure appropriate and relevant training is provided to staff in specialist systems used in data management to ensure that a consistent approach to data collection, analysis and management occurs.
3 Provide leadership in the effective management of water resources
- 3.1 Review and analyse role of hydrometric network data in development of water resource management policy within organisation, particularly in identifying deficiencies in networks.
- 3.2 Gather, review and communicate local, national and international information and best-practice policy regarding effective water resource management.
- 3.3 Analyse current, historical and trend data to inform organisation's short, medium and long-term water resource management planning.
- 3.4 Prepare clear and accurate reports according to organisational procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Data required may include:
local anecdotal data (verbal metadata)
survey data on stream sections, both cross and longitudinal
geographic information system (GIS) data
meteorological data
hydraulic analysis data
budgetary data
catchment water use datasets of actual resource use
discharge measurements
ratings tables
water licence entitlements datasets
time series data across data types.
Processes to collect, analyse, store and report hydrometric network data may include:
downloading, processing, editing, validating, quality-coding and archiving time series data
service agreements
procedures for establishing and managing ratings tables
data network audit tools, processes and software
high-level use of database software, including KISTERS and modelling
communication of hydrographic information to clients
budget development and management processes.
Mathematical and technical processes may include:
extending rating curves for monitoring sites
hydraulic analysis processes
physical and chemical interactions analysis
dataset extension techniques and processes
dataset interpolation techniques and processes
dataset creation techniques and processes, such as small ungauged catchments
estimating uncertainty of measurements or estimations
applying statistical tests to evaluate an existing ratings table
using modelling or other processes to create synthesised data parameters based on accepted procedures or standards.
Data required may include:
local anecdotal data (verbal metadata)
survey data on stream sections, both cross and longitudinal
geographic information system (GIS) data
meteorological data
hydraulic analysis data
budgetary data
catchment water use datasets of actual resource use
discharge measurements
ratings tables
water licence entitlements datasets
time series data across data types.
Processes to collect, analyse, store and report hydrometric network data may include:
downloading, processing, editing, validating, quality-coding and archiving time series data
service agreements
procedures for establishing and managing ratings tables
data network audit tools, processes and software
high-level use of database software, including KISTERS and modelling
communication of hydrographic information to clients
budget development and management processes.
Mathematical and technical processes may include:
extending rating curves for monitoring sites
hydraulic analysis processes
physical and chemical interactions analysis
dataset extension techniques and processes
dataset interpolation techniques and processes
dataset creation techniques and processes, such as small ungauged catchments
estimating uncertainty of measurements or estimations
applying statistical tests to evaluate an existing ratings table
using modelling or other processes to create synthesised data parameters based on accepted procedures or standards.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to provide leadership in hydrometric network planning and water resource management including:
gathering, interpreting and applying complex documentation related to hydrometric network planning and water resource management processes of organisation
reviewing and refining current practices used in collecting, analysing, storing and reporting hydrometric data
planning and setting priorities for the management of hydrometric data collection, storage and reporting
preparing clear and accurate reports
contributing to development of short, medium and long-term water resource management planning within organisation.
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to provide leadership in hydrometric network planning and water resource management including:
gathering, interpreting and applying complex documentation related to hydrometric network planning and water resource management processes of organisation
reviewing and refining current practices used in collecting, analysing, storing and reporting hydrometric data
planning and setting priorities for the management of hydrometric data collection, storage and reporting
preparing clear and accurate reports
contributing to development of short, medium and long-term water resource management planning within organisation.
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| J127 | NWP60112 | Advanced Diploma of Water Engineering Design | Qualification |
| D422 | NWP70107 | Graduate Certificate In Water Industry Leadership | Qualification |