Unit of competency Outline

Date retreived
22/07/2026 7:04 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Determine the properties of explosives

Determine the properties of explosives

Unit of competency
National Code
DEFEXO125
State Code
AVR64
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
26/10/2020
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
039999 - Engineering And Related Technologies, N.e.c.
Original Release Date
05/08/2016
Nominal Hours
0
Description
This unit describes the skills required to determine the properties of explosives through the process of measuring and recording during initiation or firing, in a research environment.This unit applies to those required to determine the properties of explosives independently or may contribute to the determination of the properties of explosives as a member of a collaborative team.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to.Those undertaking this unit would work independently or as part of a team, under indirect or direct supervision, using discretion and judgement and taking responsibility for the quality of their outputs. They would perform complex tasks in a range of contexts that could be unpredictable.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan for explosive testing
  • 1.1 Identify and confirm type of explosive and required test or analysis
  • 1.2 Identify nature and type of effects or properties to be determined
  • 1.3 Investigate and select appropriate methods of measuring and recording the desired effects or properties
  • 1.4 Investigate and select appropriate firing or initiation techniques and methods
  • 1.5 Prepare and review the test plan
2 Prepare for explosive testing
  • 2.1 Test and validate models, simulation and/or prototypes
  • 2.2 Incorporate modifications or alterations into the testing processes based on validation results
  • 2.3 Arrange building or purchase of necessary equipment given project constraints and available skills and materials
  • 2.4 Develop experimental designs in liaison with other staff
  • 2.5 Assemble, set up and calibrate apparatus
  • 2.6 Perform routine standardisation procedures prior to the test, and record results
3 Perform explosive test
  • 3.1 Test instrumentation required for data collection for functionality
  • 3.2 Prepare and test explosive initiation or firing mechanisms
4 Recover equipment and validate results
  • 4.1 Recover measurement and recording equipment and extract required data
  • 4.2 Analyse data for anomalies and ‘out of control’ conditions and accept or reject
  • 4.3 Assess data for validity against required information, known previous test results and/or relevant reference materials
  • 4.4 Record test procedures and, if necessary, recommend modifications to test procedures
  • 4.5 Determine properties and or effects from data and measurements collected
No information
No information
No information