Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct, maintain and remove coffer dams
Construct, maintain and remove coffer dams
Unit of competency
National Code
RIICTB309E
RIICTB309E
State Code
OCX56
OCX56
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
50
Description
This unit describes the skills and knowledge required to construct, maintain and remove coffer dams in civil construction. This includes confirming placement of marine cables, driving and bracing sheet piles, dewatering and levelling dammed areas for coffer dams with at least four sheet piles.It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to construct and remove coffer dam
- 1.1 Obtain, interpret, clarify and confirm work instructions
- 1.2 Access, interpret and apply documentation required to remove coffer dams and confirm work activity is compliant
- 1.3 Obtain and interpret emergency procedures, and identify steps required to respond to emergencies
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.6 Identify, address and report environmental issues, potential hazards and risks
- 1.7 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.8 Identify, confirm, and locate materials required for work application
2. Construct and maintain dam
- 2.1 Contact utilities to confirm placement of marine cables
- 2.2 Drive sheet piles into location according to job requirements
- 2.3 Brace sheet piles
- 2.4 Dewater and caulk dammed area according to job requirements
- 2.5 Install sump to remove excess water seepage
- 2.6 Remove mud manually from dammed area according to job requirements
- 2.7 Level dammed area for bridge work according to job requirements
3. Remove coffer dam
- 3.1 Clear dammed area of refuse and construction waste according to site requirements
- 3.2 Remove temporary concrete slab, where used
- 3.3 Flood coffer dam according to job requirements
- 3.4 Remove sheet pile
- 3.5 Extract and dismantle sheet piling according to job requirements to allow waterway to restore original flow
4. Conduct clean-up activities
- 4.1 Clear work area and dispose of or recycle materials according to site requirements
- 4.2 Clean, check, perform maintenance on and store machinery, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH173 | RIICTB309D | Construct, maintain and remove coffer dams | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |