Unit of competency Outline

Date retreived
22/07/2026 9:51 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Calculate and install natural ventilation for Type A gas appliances

Calculate and install natural ventilation for Type A gas appliances

Unit of competency
National Code
CPCPGS3054
State Code
OCN91
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
09/12/2021
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
12
Description
This unit specifies the skills and knowledge required to calculate and install natural ventilation for certified Type A gas appliances.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify natural ventilation requirements.
  • 1.1 Access, read and determine ventilation installation requirements from job specifications, relevant Australian Standards, codes, manufacturer’s specifications and jurisdictional requirements.
  • 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
  • 1.3 Identify potential hazards and determine and implement control measures.
2 Prepare for work.
  • 2.1 Create a materials list and collect materials.
  • 2.2 Select appropriate tools and equipment including personal protective equipment (PPE).
  • 2.3 Determine gas load and determine path of air supply.
  • 2.4 Calculate free ventilation area and ventilation openings.
3 Install ventilation and test appliance.
  • 3.1 Install ventilation without damage to the building structure, surrounding environment or other services.
  • 3.2 Test ventilation operations according to job specifications, relevant Australian Standards, codes, manufacturer’s specifications and jurisdictional requirements.
4 Clean up.
  • 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
  • 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
State Code National Code Title Type
WF900 CPCPGS3054A Calculate and install natural ventilation for Type A gas appliances Unit of competency
State Code National Code Title Type
BGB7 CPC32720 Certificate III in Gas Fitting Qualification
BGC2 CPC32420 Certificate III in Plumbing Qualification