Unit of competency Outline

Date retreived
22/07/2026 3:21 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Carry out oxyacetylene brazing of components

Carry out oxyacetylene brazing of components

Unit of competency
National Code
AURVTW002
State Code
AWY99
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
14/04/2016
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030711 - Boilermaking And Welding
Original Release Date
13/07/2016
Nominal Hours
20
Description
This unit describes the performance outcomes required to carry out oxyacetylene brazing. It involves preparing for the task, selecting, setting up and operating an oxyacetylene welding plant, setting gas pressures, identifying and adjusting required flame appropriate to brazing requirements, selecting and using suitable personal protective equipment (PPE), performing oxyacetylene brazing to given specifications, and completing workplace processes and documentation. It applies to those working in the automotive service and repair industry.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare to braze components
  • 1.1 Job requirements are determined from workplace instructions
  • 1.2 Technical information is accessed and interpreted to enable brazing to be performed according to manufacturer specifications
  • 1.3 Hazards associated with the work are identified and risks are managed
  • 1.4 Tools and equipment, including PPE, are selected and checked for serviceability
  • 1.5 Work is planned to identify brazing methods, minimise waste, and use time efficiently
2. Complete brazing procedures
  • 2.1 Oxyacetylene equipment is set up, gauges and working pressures are set, and flames are adjusted according to equipment manufacturer operating procedures and workplace procedures
  • 2.2 Brazing operations are conducted according to job requirements, workplace procedures, and safety and environmental requirements
  • 2.3 Brazing procedures are completed without causing damage to components or systems
3. Complete work processes
  • 3.1 Final inspection is made to ensure work meets workplace expectations and component is presented ready for use
  • 3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
  • 3.3 Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
  • 3.4 Workplace documentation is processed according to workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WF576 AURVTW2002 Carry out brazing procedures Unit of competency