Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct pavement sweeping operations

Conduct pavement sweeping operations

Unit of competency
National Code
RIICBS206D
State Code
WH051
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
29/05/2014
Nominal Hours
16
Description
This unit describes a participant’s skills and knowledge required to conduct pavement sweeping operations in Civil Construction This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to conduct pavement sweeping operations
  • 1.1 Access, interpret and apply pavement sweeping operations documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.4 Select and wear personal protective equipment appropriate for work activities
  • 1.5 Confirm and apply environmental protection and safety requirements
  • 1.6 Obtain, interpret and implement traffic management signage requirements
  • 1.7 Select and check for faults plant, tools and equipment to carry out tasks
  • 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Sweep surfaces
  • 2.1 Carry out pre-start, start-up, park up, shutdown and secure equipment procedures
  • 2.2 Identify wind direction and develop a sweeping plan to minimise the creation of dust
  • 2.3 Drive and operate broom at a speed and pressure that ensures maximum sweeping effect and minimum damage to bristles
  • 2.4 Extend sweeping 300 mm (minimum) outside the area to be covered, where possible
  • 2.5 Carry out preliminary and final sweeps where there is excessive material
  • 2.6 Sweep material away from work in progress and away from newly finished work
  • 2.7 Adapt sweeping procedures to suit surface type
  • 2.8 Remove loose aggregate from newly sealed surface
3. Clean up
  • 3.1 Deposit sweepings to avoid contamination drains, pits or nature strips
  • 3.2 Create windrows to protect drains from run off due to overnight rain
  • 3.3 Clear work area and dispose of or recycle materials
  • 3.4 Clean, check, maintain and store plant, tools and equipment
  • 3.5 Carry out housekeeping requirements
No information
No information
Replaces
State Code National Code Title Type
WB017 RIICBS206A Conduct pavement sweeping operations Unit of competency
Replaced By
State Code National Code Title Type
OBM83 RIICBS316 Conduct pavement sweeping operations Unit of competency