Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage road construction and maintenance

Manage road construction and maintenance

Unit of competency
National Code
FPIFGM5208B
State Code
D6019
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/05/2011
State Implementation and Classification
Approved Date
20/02/2013
Field of Education
030901 - Construction Engineering
Original Release Date
20/02/2013
Nominal Hours
150
Description
This unit describes the outcomes required to plan for and implement road construction and maintenance procedures. Roads may include heavy duty, all weather logging roads through to unsurfaced earth roadsGeneral workplace legislative and regulatory requirements apply to this unit; however there are no specific licensing or certification requirements at the time of publicationThis unit replaces FPIFGM5208A Manage road construction and maintenance
Notes
Elements and Performance Criteria
1. Plan road construction and maintenance
  • 1.1. Applicable occupational health and safety (OHS), environmental, legislative and organisational requirements relevant to managing road construction and maintenance are identified and followed
  • 1.2. Logging and topography details are obtained and assessed while applying environmental management considerations
  • 1.3. Road location, design and construction requirements are identified and inspected to analyse costs, benefits and impact on the forest
  • 1.4. Timeframe for use of the road and likely weather conditions are checked
  • 1.5. Timber extraction methods and storage requirements for roads, tracks, equipment placement, falling and recovery rates, and delivery schedules are calculated and documented
  • 1.6. Authorities are consulted and approvals obtained for road development
  • 1.7. Formal road construction/maintenance plan is prepared for approval in line with site procedures and environmental requirements
  • 1.8. Communication with others is established and maintained in line with OHS requirements
2. Implement road construction
  • 2.1. Road and track design and construction plan is clearly communicated to site personnel to enable preparation
  • 2.2. Personnel, material and equipment required for the construction are coordinated and scheduled in line with organisational guidelines
  • 2.3. Operational procedures for roads are planned with site personnel in line with design plan and environmental requirements
  • 2.4. Construction of roads and tracks is monitored and unexpected ground, water, vegetation or other environmental conditions are reported to appropriate personnel
  • 2.5. Technical assistance is provided to site personnel in preparing roads and tracks
3. Maintain roads
  • 3.1. Roads and tracks are assessed for maintenance requirements and outcomes are recorded
  • 3.2. Personnel, material and equipment required for maintenance are coordinated and scheduled in line with organisational guidelines
  • 3.3. Site environmental conditions are adhered to in line with regulations
  • 3.4. Maintenance schedule for the site is organised in conjunction with operational personnel and source of equipment, taking seasonal weather conditions into consideration
  • 3.5. Operational staff, clients and contractors are communicated with throughout maintenance activities to ensure smooth operations
4. Monitor and review road construction and maintenance
  • 4.1. Monitoring schedule is developed and adhered to in line with organisational policy and environmental requirements
  • 4.2. Checks are made to ensure OHS procedures are observed and followed and site environmental conditions are adhered to in line with regulations
  • 4.3. Checks are made in line with organisational policy to ensure that performance indicators, targets and specifications are being met and process or methods are amended as required
  • 4.4. Data and documentation from construction or maintenance activities are analysed against the plan in line with organisational guidelines
  • 4.5. Recommendations are prepared, based on the analysis of data and feedback collected during the construction and maintenance process
  • 4.6. Road construction and maintenance process is recorded and reported to appropriate personnel
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHS requirements:
are to be in line with applicable commonwealth, state or territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices, including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable commonwealth, state or territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use, maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Logging may include:
activities covering a full range of species, log sizes, falling and retention densities
slope and other environmental conditions
cable systems usage, including:
high lead (no skyline)
standing skyline and a running skyline with hauling both uphill and downhill
logs attached to optimise payload without exceeding the lift or haul capacity of the system
Topography is to include:
map of the designated area showing terrain levels
Environmental management considerations may include:
ground growth
canopy
general forest lean
wind speed and direction
fallen trees
density of trees
ground slope
soil and water protection
ground hazards and obstacles
Road location is to include:
where roads are constructed, taking into account:
site requirements
topographic information
environmental considerations
Construction is to include:
development method chosen to construct roads with:
control points
required grades
water crossing points and structures
Extraction is to include:
methods of removing logs from the work site with mechanical equipment and cables, considering site conditions and specific log location, in an order that minimises downtime and risk of snags, breakages and hang-ups
Authorities are to include:
local government councils
shires with local planning and zoning authority for a given region
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice
Material may include:
road base
gravel
crushed rock
sand and bluestone
cords and pipes for water crossings
Equipment may include:
earthmoving equipment
Maintenance
is the process of assessing road defects and undertaking the necessary rectification work
Records and reports may include:
road construction and maintenance operations
difficulties or issues faced
environmental issues
costs
hazards
incidents
equipment malfunctions
recommendations for future work
results
and may be:
manual
a computer-based system
other appropriate organisational communication system
Appropriate personnel may include:
supervisors
suppliers
clients
colleagues
managers
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently manage road construction and maintenance in line with organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to, and satisfy, all of the requirements of the elements of this unit and include demonstration of:
following applicable commonwealth, state or territory legislative and regulatory requirements and codes of practice relevant to managing road construction and maintenance
following organisational policies and procedures relevant to managing road construction and maintenance
managing road construction and maintenance in line with work order and within prescribed organisational tolerances
coordinating development of roads in line with organisational requirements
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaces
State Code National Code Title Type
S4690 FPIFGM5208A Manage road construction and maintenance Unit of competency
Replaced By
State Code National Code Title Type
AXK53 FWPFGM5208 Manage road construction and maintenance Unit of competency
State Code National Code Title Type
S487 FPI50105 Diploma of Forest and Forest Products Qualification
J478 FPI50111 Diploma of Forest and Forest Products Qualification