Unit of competency Outline
Date retreived
22/07/2026 6:50 PM AWST
22/07/2026 6:50 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor Power Generation Plant Reliability
Monitor Power Generation Plant Reliability
Unit of competency
National Code
UEPOPS510A
UEPOPS510A
State Code
S5294
S5294
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
22/06/2011
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
22/06/2011
Nominal Hours
40
Description
1)
This unit deals with the skills and knowledge required to monitor the generating plant reliability.
This unit deals with the skills and knowledge required to monitor the generating plant reliability.
Notes
Elements and Performance Criteria
1 Collect data
- 1.1 Information is coordinated/collected in accordance with statutory, industry and enterprise/site requirements
- 1.2 Plant is correctly identified and status established
- 1.3 Tools and equipment are correctly identified and acquired
- 1.4 Specialist assistance/equipment is sort when required
- 1.5 Information is recorded in accordance with statutory, industry and enterprise/site requirements
- 1.6 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training.
2 Perform calculations
- 2.1 Availability and performance calculations are performed in accordance with statutory, industry and enterprise/site requirements
- 2.2 Calculations are checked for accuracy
3 Evaluate and analyse information
- 3.1 Analyse technical and operational information in a logical and sequential manner, and identify if abnormal plant operating condition/performance exists
- 3.2 Causes of any abnormal plant reliability are identified
- 3.3 Plant integrity is maintained through consultation and operational documentation
- 3.4 Specialist assistance is sought as required
4 Produce report and complete work
- 4.1 Information and data are coordinated and documented in accordance with requirements
- 4.2 Reports are produced in accordance with statutory, industry and enterprise/site requirements
- 4.3 Actions necessary to rectify loss of reliability are recommended to the appropriate personnel
- 4.3 Implementation of recommendations are monitored to ensure plant reliability
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYF91 | UTPNEG236A | Monitor power generation plant reliability | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE440 | UEPOPS510B | Monitor power generation plant reliability | Unit of competency |