Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate power generation system shutdown
Coordinate power generation system shutdown
Unit of competency
National Code
PPMEPG330
PPMEPG330
State Code
AXI41
AXI41
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/08/2016
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
25/08/2016
Nominal Hours
40
Description
This unit of competency describes the skills and knowledge required to shut down power generation systems in both planned and unplanned situations and to communicate shutdown information and data to internal and external personnel.The unit applies to production operators and technicians who coordinate power generation system shutdowns, in a pulp or paper manufacturing facility. This typically involves working in a facility with complex integrated equipment and continuous operations.No licensing, legislative or certification requirements apply to this unit at the time of publication. Where the turbine equipment falls under the category for which a High Risk Work Licence is required, this unit should not be used and the appropriate unit should be sought.
Notes
Elements and Performance Criteria
1. Coordinate planned shutdown
- 1.1 Use maintenance schedules to plan and coordinate shutdown of power generation system
- 1.2 Follow procedures to shut down process supplies
- 1.3 Follow work health and safety and standard operating procedures (SOP) to initiate appropriate isolations and shut down systems
- 1.4 Inspect system and record and report further maintenance requirements
- 1.5 Select, fit, use and maintain personal protective equipment according to job requirements and task to be undertaken
2. Respond to unplanned shutdown
- 2.1 Respond to unplanned shutdown immediately
- 2.2 Initiate appropriate isolations, identify and locate cause of unplanned shutdown
- 2.3 Rectify, isolate and or contain faulty plant according to manufacturer's specifications/SOPs to allow continued production
- 2.4 Follow procedures to shut down process supplies where fault cannot be rectified
- 2.5 Assess effects of unplanned shutdown to determine impact on operations
- 2.6 Communicate unplanned shutdown to appropriate personnel and power authorities, according to organisational procedures/SOPs
3. Record and report shutdown data
- 3.1 Record shutdown and corrective action processes
- 3.2 Report shutdown information to relevant personnel and power authorities according to organisational procedures/SOPs
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUY09 | FPPEPG330A | Co-ordinate power generation system shutdown | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODT58 | PPMEPG301 | Perform power generation operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH5 | PPM20216 | Certificate II in Papermaking Operations | Qualification |
| BAH2 | PPM30216 | Certificate III in Papermaking Operations | Qualification |
| BAH4 | PPM20116 | Certificate II in Pulping Operations | Qualification |
| BAH1 | PPM30116 | Certificate III in Pulping Operations | Qualification |