Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install cast plaster blockwork and wall sheet panels

Install cast plaster blockwork and wall sheet panels

Unit of competency
National Code
CPCCSP3006
State Code
OCP64
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040317 - Plastering
Original Release Date
01/06/2021
Nominal Hours
16
Description
This unit specifies the skills and knowledge required to set out and construct a wall by laying cast plaster blocks. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them, without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare to install plaster blockwork and wall sheet panels.
  • 1.1 Read and interpret work instructions and plan sequence of work.
  • 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
  • 1.3 Select and use personal protective equipment (PPE) for each stage of the task.
  • 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
  • 1.5 Select tools and equipment, check for serviceability and report any faults.
  • 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Set out and prepare base for blockwork and wall sheet panels.
  • 2.1 Clean base in preparation for first course.
  • 2.2 Set out blockwork and panels to position, and prepare surface to be dry, horizontal and flat.
  • 2.3 Set out position, gauge and bond of blockwork and panels to batten at specified fixing points.
3 Lay plaster blockwork and wall sheet panels.
  • 3.1 Prepare adhesives to required consistency and quantity to manufacturers’ specifications.
  • 3.2 Lay base course to set out line.
  • 3.3 Install blockwork/wall sheet panels and vertical abutments level, plumb and straight.
  • 3.4 Maintain bond and gauge to the set out height and width.
  • 3.5 Remove surplus adhesive and clean blocks.
  • 3.6 Apply solid plaster and finish to requirements.
4 Clean up.
  • 4.1 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
  • 4.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
No information
No information
Replaces
State Code National Code Title Type
W9549 CPCCSP3006A Install cast plaster blockwork Unit of competency
State Code National Code Title Type
BGD3 CPC31020 Certificate III in Solid Plastering Qualification