Unit of competency Outline

Date retreived
23/07/2026 12:54 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform advanced tower crane erection

Perform advanced tower crane erection

Unit of competency
National Code
CPCCRI3016
State Code
OCP91
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
01/06/2021
Nominal Hours
20
Description
This unit of competency specifies the skills and knowledge required to conduct advanced tower crane erection. It includes coordinating the slinging, stability, lifting, moving and placement of tower cranes and tower crane sections in conjunction with the crane operator, and selecting equipment and load distribution and calculation.It applies to workers who erect tower cranes and coordinate all aspects of lifting, moving and placing sections, and who would be expected to take responsibility for organising and completing these tasks with a high degree of self direction.Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some states and territories. For further information, check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1 Plan and prepare to perform advanced tower crane erection.
  • 1.1 Interpret work order and associated documentation and clarify requirements with relevant persons.
  • 1.2 Plan all work to comply with relevant legislation, regulations, standards, codes, work health and safety, environmental and workplace requirements.
  • 1.3 Plan and implement required risk controls.
  • 1.4 Review crane erection, rigging and dismantling plan to ensure conformity with manufacturer and engineering specifications.
  • 1.5 Check foundation that will support crane base is structurally suitable and conforms with engineering standards.
  • 1.6 Conduct required calculations to determine load mass and distribution.
2 Select and check equipment.
  • 2.1 Erect required safety signage and barricades and fit personal protective equipment (PPE).
  • 2.2 Select resources, materials, tools and equipment in accordance with load charts and inspect for compliance with work order.
  • 2.3 Inspect lifting equipment in accordance with manufacturer and workplace requirements.
  • 2.4 Label, reject and dispose of any lifting and load-shifting equipment identified as inconsistent with manufacturer requirements, to prevent its use in any circumstance.
  • 2.5 Select elevated work platforms and other means of mechanical access systems as specified.
  • 2.6 Install fall arrest equipment.
  • 2.7 Select personnel cartage systems.
  • 2.8 Calculate and confirm load mass and load distribution.
3 Assemble and erect crane.
  • 3.1 Locate base of crane and position in accordance with manufacturer and engineering specifications.
  • 3.2 Erect bottom tower and climbing frame/transition piece, and install, level and plumb in accordance with manufacturer and engineering specifications.
  • 3.3 Install and secure tower braces or guys to support tower crane.
  • 3.4 Assemble, erect and install mast, turntable, machine deck and power pack of crane in accordance with manufacturer requirements.
  • 3.5 Assemble and erect main jib and counter jib in accordance with manufacturer requirements.
  • 3.6 Lift counterweights into cradles and secure in accordance with manufacturer requirements.
  • 3.7 Install wire ropes, hook and block reeving in accordance with manufacturer requirements.
4 Climb (raise/lower) tower crane.
  • 4.1 Remove drop ladder, and place and secure monorail.
  • 4.2 Secure crane and place at balance point ready for climbing.
  • 4.3 Remove tower bolts to transition piece, fit drifts and check rollers.
  • 4.4 Move tower section into place in accordance with manufacturer requirements.
  • 4.5 Reconnect crane with bolts and conduct a visual check of all components and connectors.
5 Dismantle tower crane.
  • 5.1 Disconnect electrical and hydraulic lines safely.
  • 5.2 Dismantle power pack, counterweights, climbing frame and crane deck, and lower safely to the ground.
6 Clean up.
  • 6.1 Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
  • 6.2 Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
D7403 CPCCRI3016A Perform advanced tower crane erection Unit of competency
State Code National Code Title Type
BGB5 CPC30720 Certificate III in Rigging Qualification