Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake operator level preventative maintenance
Undertake operator level preventative maintenance
Unit of competency
National Code
FPPPRM210A
FPPPRM210A
State Code
AUY24
AUY24
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
Field of Education
030717 - Plant And Machine Operations
Original Release Date
Nominal Hours
Description
This unit describes the outcomes required to undertake operator level preventative maintenance in the pulp and paper industryGeneral legislation, regulatory, licensing and certification requirements applicable to this unit are detailed in the range statement
Notes
Elements and Performance Criteria
1. Carry out preventative maintenance inspections of plant and equipment
- 1.1. Preventative maintenance inspections of plant and equipment are carried out within Occupational Health and Safety (OHS) regulations, environmental and safe working requirements/practices, Standard Operating
- 1.2. Routine preventative maintenance inspections are undertaken
- 1.3. Faulty plant and equipment are identified
- 1.4. Faulty plant and equipment, as identified, are communicated and documented
2. Carry out preventative maintenance of plant and equipment
- 2.1. Preventative maintenance of plant and equipment is carried out within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- 2.2. Location of plant and equipment is identified
- 2.3. Routine preventative maintenance sequence of activities is determined
- 2.4. Isolation procedures are followed as required
- 2.5. Process and navigation controls are interpreted
- 2.6. Preventative maintenance activities are undertaken
- 2.7. Appropriate tools, materials and equipment are selected and used for operator level preventative maintenance
- 2.8. Preventative maintenance activities are documented
3. Action faults
- 3.1. Faults are actioned within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- 3.2. Faulty plant and equipment is actioned within limits of responsibility
- 3.3. Action on faulty plant and equipment is communicated and documented
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Routine preventative maintenance inspections may include:
levels in sight glasses
belt fatigue
gear backlash
stretch and slack in chains
sprocket wear
gear box noise and heat
damaged equipment or components
control panel indicators
electronic control indicators
air and oil pressure gauges
flow levels
pressure checks
Routine preventative maintenance activities may include:
oil top ups
blade changes
filter changes or cleaning
greasing
lubricating
housekeeping
pressure checks
removal or replacing
maintaining or replacing consumables
Actions may include:
shutdown
isolation
by-passing systems
making adjustments
assisting in remedial maintenance
communicating with maintenance and engineering personnel
confirming availability of parts
containment of potential hazards, spillage and leaks
process adjustments
reporting to authorised person
rectifying problem within level of responsibility
Maintenance may include:
operator level maintenance as per site agreement
operator maintenance schedules
maintenance systems
maintenance suppliers
pro-active maintenance strategies e.g. Total Productive Maintenance (TPM), Reliability Centred Maintenance (RCM)
Equipment may include:
personal protective equipment and clothing
compressed air
hand and power tools
machine systems
computer systems
electronic screens and alarms
process control systems
analogue and digital instrumentation
fully automated, semi-automated, manually operated plant and equipment appropriate to undertaking preventative maintenance
Legislation, regulatory, licensing and certification requirements may include:
OHS and environmental requirements (local, state and commonwealth)
Documentation, procedures and reports may include:
SOP
quality procedures
environmental sustainability requirements/practices
plant manufacturing operating manuals
enterprise policies and procedures
oil or chemical spills and disposal guidelines
plant isolation documentation
safe work documentation e.g. plant clearance, job safety analysis, permit systems
Electronic control systems may include:
Digital Control System (DCS)
touch screens
robotics
Communications may include:
interaction with:
internal/external customers and suppliers
team members
production/service co-ordinators
maintenance services
operational support personnel
operational management
statutory authorities
Situational awareness may include:
awareness of :
traffic
pedestrians
location of equipment
product
hazards
obstruction
unexpected movement
Forms of communication may include:
written e.g. log books, emails, incident and other reports, run sheets, data entry
reading and interpreting documentation e.g. SOP, manuals, checklists, drawings
verbal e.g. radio skills, telephone, face to face, handover
non-verbal e.g. hand signals, alarms, observations
signage e.g. safety, access
Sensory information may include:
visual
sound
feel
touch
smell
vibration
temperature
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Routine preventative maintenance inspections may include:
levels in sight glasses
belt fatigue
gear backlash
stretch and slack in chains
sprocket wear
gear box noise and heat
damaged equipment or components
control panel indicators
electronic control indicators
air and oil pressure gauges
flow levels
pressure checks
Routine preventative maintenance activities may include:
oil top ups
blade changes
filter changes or cleaning
greasing
lubricating
housekeeping
pressure checks
removal or replacing
maintaining or replacing consumables
Actions may include:
shutdown
isolation
by-passing systems
making adjustments
assisting in remedial maintenance
communicating with maintenance and engineering personnel
confirming availability of parts
containment of potential hazards, spillage and leaks
process adjustments
reporting to authorised person
rectifying problem within level of responsibility
Maintenance may include:
operator level maintenance as per site agreement
operator maintenance schedules
maintenance systems
maintenance suppliers
pro-active maintenance strategies e.g. Total Productive Maintenance (TPM), Reliability Centred Maintenance (RCM)
Equipment may include:
personal protective equipment and clothing
compressed air
hand and power tools
machine systems
computer systems
electronic screens and alarms
process control systems
analogue and digital instrumentation
fully automated, semi-automated, manually operated plant and equipment appropriate to undertaking preventative maintenance
Legislation, regulatory, licensing and certification requirements may include:
OHS and environmental requirements (local, state and commonwealth)
Documentation, procedures and reports may include:
SOP
quality procedures
environmental sustainability requirements/practices
plant manufacturing operating manuals
enterprise policies and procedures
oil or chemical spills and disposal guidelines
plant isolation documentation
safe work documentation e.g. plant clearance, job safety analysis, permit systems
Electronic control systems may include:
Digital Control System (DCS)
touch screens
robotics
Communications may include:
interaction with:
internal/external customers and suppliers
team members
production/service co-ordinators
maintenance services
operational support personnel
operational management
statutory authorities
Situational awareness may include:
awareness of :
traffic
pedestrians
location of equipment
product
hazards
obstruction
unexpected movement
Forms of communication may include:
written e.g. log books, emails, incident and other reports, run sheets, data entry
reading and interpreting documentation e.g. SOP, manuals, checklists, drawings
verbal e.g. radio skills, telephone, face to face, handover
non-verbal e.g. hand signals, alarms, observations
signage e.g. safety, access
Sensory information may include:
visual
sound
feel
touch
smell
vibration
temperature
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence should be relevant to the work. It should satisfy the requirements of the elements and performance criteria and include consideration of:
the required knowledge and skills tailored to the needs of the specific workplace
applicable OHS regulations, environmental and safe working requirements/practices, SOP and housekeeping requirements
applicable aspects of the range statement
practical workplace demonstration of skills in undertaking operator level preventative maintenance
Context of and specific resources for assessment
A workplace assessment must be used to assess:
the application of required knowledge on the job
the application of skills on the job, over time and under a range of typical conditions that may be experienced in undertaking operator level preventative maintenance
Access to the full range of equipment involved in undertaking operator level preventative maintenance in a pulp or paper mill is required
Method of assessment
A combination of assessment methods should be used. The following examples are appropriate for this unit:
observation of applied skills and knowledge on the job
workplace demonstrations via a mock-up or simulation that replicate part/s of the job
answers to written or verbal questions about specific skills and knowledge
third-party reports from relevant and skilled personnel
written evidence e.g. log sheet entries, checklist entries, test results
Assessment processes and techniques must be culturally appropriate and in keeping with the language and literacy capacity of the learner and the work being performed. This includes conducting an assessment in a manner that allows thoughts to be conveyed verbally so that the learner can both understand and be understood by the assessor (e.g. use plain English and terminology used on the job)
A holistic assessment with other units relevant to the pulp and paper industry, mill and job role is recommended
Additional information on approaches to assessment for the pulp and paper industry is provided in the Assessment Guidelines for this Training Package
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence should be relevant to the work. It should satisfy the requirements of the elements and performance criteria and include consideration of:
the required knowledge and skills tailored to the needs of the specific workplace
applicable OHS regulations, environmental and safe working requirements/practices, SOP and housekeeping requirements
applicable aspects of the range statement
practical workplace demonstration of skills in undertaking operator level preventative maintenance
Context of and specific resources for assessment
A workplace assessment must be used to assess:
the application of required knowledge on the job
the application of skills on the job, over time and under a range of typical conditions that may be experienced in undertaking operator level preventative maintenance
Access to the full range of equipment involved in undertaking operator level preventative maintenance in a pulp or paper mill is required
Method of assessment
A combination of assessment methods should be used. The following examples are appropriate for this unit:
observation of applied skills and knowledge on the job
workplace demonstrations via a mock-up or simulation that replicate part/s of the job
answers to written or verbal questions about specific skills and knowledge
third-party reports from relevant and skilled personnel
written evidence e.g. log sheet entries, checklist entries, test results
Assessment processes and techniques must be culturally appropriate and in keeping with the language and literacy capacity of the learner and the work being performed. This includes conducting an assessment in a manner that allows thoughts to be conveyed verbally so that the learner can both understand and be understood by the assessor (e.g. use plain English and terminology used on the job)
A holistic assessment with other units relevant to the pulp and paper industry, mill and job role is recommended
Additional information on approaches to assessment for the pulp and paper industry is provided in the Assessment Guidelines for this Training Package
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXF89 | PPMPRM210 | Undertake operator level preventative maintenance | Unit of competency |