Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate and monitor a hydro turbine

Operate and monitor a hydro turbine

Unit of competency
National Code
UEPOPS360
State Code
OAG72
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
31/10/2018
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
030717 - Plant And Machine Operations
Original Release Date
15/05/2019
Nominal Hours
54
Description
This unit involves the skills and knowledge required to operate, inspect and monitor in-service hydro turbines. Turbines are a basic component in most methods of generating electricity in hydro generation power facilities.Competency in this unit requires the ability to plan work, operate hydro turbine plant, test hydro turbine plant, analyse hydro turbine plant faults, monitor and inspect hydro turbine plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication. Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan and prepare work
  • 1.1 Safety issues related to operating and monitoring hydro turbine plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements
  • 1.2 Work tasks and hydro turbine plant requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures
  • 1.3 Hydro turbine run up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements
  • 1.4 Inspection, preoperational tests and field preparations for hydro turbine plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations
  • 1.5 Hydro turbine plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations
  • 1.6 Sequence for recommissioning of hydro turbine plant is determined, in accordance with workplace procedures and site requirements
2 Operate hydro turbineplant
  • 2.1 Output is adjusted to achieve required hydro turbine operating conditions and demand, in accordance with workplace procedures and operational requirements
  • 2.2 Hydro turbine plant is operated within limits of its' design, in accordance with workplace procedures
  • 2.3 Hydro turbine plant is monitored and observed, in accordance with workplace procedures, to detect deviations from required operating conditions
  • 2.4 Corrective actions are taken to rectify hydro turbine abnormalities, in accordance with workplace procedures and manufacturers' recommendations
3 Test hydro turbineplant operation
  • 3.1 Operational tests are performed, in accordance with workplace procedures
  • 3.2 Hydro turbine plant is observed for correct operational response, in accordance with workplace procedures
  • 3.3 Corrective action is taken, in accordance with workplace procedures, when response does not meet with documentation, hydro turbine plant integrity or personnel safety requirements
  • 3.4 Hydro turbine plant is returned to required safe operational status upon completion of testing, in accordance with workplace procedures
4 Analyse hydro turbineplant faults
  • 4.1 Cause of abnormal hydro turbine plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information
  • 4.2 Actions necessary to rectify faults are correctly determined, in accordance with workplace procedures
  • 4.3 Hydro turbine plant integrity and personnel safety is maintained, in accordance with workplace procedures, and in consultation with appropriate personnel and technical and operational documentation
5 Monitor and inspect hydro turbineplant
  • 5.1 Hydro turbine plant to be monitored and inspected is physically identified, in accordance with workplace procedures
  • 5.2 Hydro turbine plant is monitored and inspected, in accordance with workplace procedures, for normal operation or to detect deviations
  • 5.3 Corrective action is taken, in accordance with workplace procedures
  • 5.4 Appropriate personnel are notified, in accordance with workplace procedures, when defects are detected
6 Complete documentation
  • 6.1 Hydro turbine plant problems, movements, and status are reported, in accordance with workplace procedures
  • 6.2 Documentation is updated, in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WE379 UEPOPS360A Operate and Monitor a Hydro Turbine Unit of competency
Replaced By
State Code National Code Title Type
ODY95 UEPOPS072 Operate and monitor a hydro turbine Unit of competency