Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Assess the environmental risk and impact of a project activity or process

Assess the environmental risk and impact of a project activity or process

Unit of competency
National Code
MSS025018
State Code
OAF60
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/10/2018
State Implementation and Classification
Approved Date
19/02/2019
Field of Education
080315 - Project Management
Original Release Date
19/02/2019
Nominal Hours
80
Description
This unit describes the skills and knowledge to evaluate the risks and impacts associated with a specific project activity or process. It includes researching and describing the activity or process and local environment, identifying relevant environmental issues, assessing environmental risks or impacts, and then identifying appropriate environmental management actions and/or alternatives. Personnel will have access to an organisation environmental management plan for the site and/or a checklist to guide risk or impact assessment of the activity or process against organisation, community, and/or legislative requirements. This unit applies to environmental technicians working in a range of industry sectors, including environmental monitoring, and sampling; occupational hygiene monitoring; groundwater and clean water; water treatment, storm and wastewater management; solid and hazardous waste management; site remediation or rehabilitation; management of contaminated sites; geotechnical services and civil engineering; natural resource management; resource efficiency. They work under the supervision of environmental managers, scientists, engineers and/or planners.No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1 Clarify the project activity or process and environmental management framework
  • 1.1 Review the history of the project activity or process and scope of the required risk and impact assessment
  • 1.2 Identify legislative, regulatory and licensing requirements
  • 1.3 Access, read and interpret available information about the site, including organisation environmental management documents or risk assessment guidelines
  • 1.4 Write a detailed description of all phases of the project or process and the site or project environment
  • 1.5 Confirm project or process details, risk assessment procedure and risk assessment criteria with supervisor
2 Identify environmental issues for project activity or process
  • 2.1 Consult with organisation personnel to identify environmental issues
  • 2.2 Confirm with supervisor if input from community representatives and environmental specialists is required
  • 2.3 Identify significant hazards and short and long-term risks associated with the process or project activity
  • 2.4 Analyse each part of the process or project for impacts on the physical, biological and social components of the local environment and ecological linkages operating at the site
  • 2.5 Identify both positive and negative impacts
3 Assess environmental risks and impacts
  • 3.1 Use agreed assessment criteria to evaluate project activity or process against legislative, regulatory and licensing requirements, site terms and conditions, community values, and organisation environmental management policies and plans
  • 3.2 Summarise all significant environmental risks and impacts and the evidence used to justify the assessment
4 Evaluate alternatives
  • 4.1 Read and interpret organisation environmental management documents to identify specified methods for controlling risks and minimising impacts at the site
  • 4.2 Work with relevant personnel and experts to consider alternative solutions
  • 4.3 Identify amendments to project activities, alternative processes or improved environmental management actions to minimise risks and impacts
  • 4.4 Identify feasible and economically viable solutions and document the case for adopting them
5 Report findings
  • 5.1 Report the assessment of environmental risks and impacts in the required format and expected timeframe
  • 5.2 Brief supervisor and stakeholders about the environmental assessment process and outcomes
No information
No information
Replaces
State Code National Code Title Type
BAK82 MSS025002 Assess the environmental risk or impact of a project activity or process Unit of competency
Replaced By
State Code National Code Title Type
OEQ91 MSS025031 Assess the environmental risk and impact of a project activity or process Unit of competency