Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct screw piling operations
Conduct screw piling operations
Unit of competency
National Code
RIICFW308
RIICFW308
State Code
OCY36
OCY36
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
040301 - Building Science And Technology
Original Release Date
18/06/2021
Nominal Hours
35
Description
This unit describes the skills and knowledge required to conduct screw piling operations in civil construction including establishing locations for and installing screw piles. It applies to those working in operational roles. They generally work under supervision to undertake a prescribed range of functions involving known routines and procedures and take some responsibility for the quality of work outcomes.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to conduct screw piling operations
- 1.1 Obtain, interpret and confirm work instructions
- 1.2 Access, interpret and apply documentation required to conduct screw piling operations and confirm work activity is compliant
- 1.3 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Confirm and comply with environmental protection, safety and traffic management signage requirements
- 1.6 Identify potential hazards and environmental issues, implement control measures within scope of own role and escalate where required
- 1.7 Select plant, tools and equipment required to carry out tasks and check for faults
- 1.8 Identify, confirm, and locate materials required for work application
2. Position and install screw piles
- 2.1 Establish location for piles from reference points and set out according to job requirements
- 2.2 Position and confirm operation of plant and related equipment
- 2.3 Check screw pile for conformity with job requirements
- 2.4 Bore hole and install screw pile according to job requirements
3. Conduct clean-up activities
- 3.1 Clear work area and dispose of or recycle materials according to site requirements
- 3.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |
| BGL6 | RII31220 | Certificate III in Civil Foundations | Qualification |