Unit of competency Outline
Date retreived
23/07/2026 12:58 AM AWST
23/07/2026 12:58 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design a basic single zone duct distribution system
Design a basic single zone duct distribution system
Unit of competency
National Code
MEM23139
MEM23139
State Code
OEU65
OEU65
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
030703 - Industrial Engineering
Original Release Date
19/04/2023
Nominal Hours
35
Description
This unit of competency defines the skills and knowledge required to use air flow and distribution principles used in heating, ventilation, air conditioning and refrigeration (HVACR) systems and to identify different system configurations to design a single, one-air distribution system and service-related system components. The system is designed to meeting environmental and cost control requirements.A single zone duct distribution system is a basic central system which supplies a constant air volume, or a variable air volume, at low, medium or high pressure through a single duct.The unit is suitable for people working as supervisors, technicians and HVACR draftspersons, and for those pursuing manufacturing engineering or related technical qualifications and careers.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Determine design specification for basic single zone duct distribution system
- 1.1 Obtain and implement work health and safety (WHS) and environmental requirements for the work area
- 1.2 Determine design requirements for the single zone duct distribution system from customer requirements, job specifications, and briefings or discussions with appropriate personnel
- 1.3 Identify and interpret relevant codes and standards
- 1.4 Prepare final specifications for the design and obtain relevant approvals
- 1.5 Identify sources of professional and technical assistance
- 1.6 Establish coordination and contingency management requirements of design work with other HVACR and building systems team members
- 1.7 Obtain resources required for the design task in accordance with organisational procedures
2. Design basic single zone duct distribution system
- 2.1 Review options for basic single zone duct distribution system design and compare against specified requirements
- 2.2 Select most suitable single zone duct distribution system design to meet requirements
- 2.3 Use 3D CAD system to design layout and other features of single zone duct distribution system against requirements
- 2.4 Select appropriate duct materials and duct system components, including an appropriate fan for distribution
- 2.5 Consult as appropriate on any design adjustments required to meet contingencies and unexpected situations
- 2.6 Review design for cost reductions and compliance with relevant environmental and regulatory requirements
- 2.7 Review final design with appropriate personnel and make any required adjustments
3. Evaluate and finalise design
- 3.1 Prepare final design documentation and any required construction documentation
- 3.2 Prepare final report according in accordance with organisational procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE952 | MEM23139A | Design a basic single zone duct distribution system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIW7 | MEM50222 | Diploma of Engineering - Technical | Qualification |