Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform dogging

Perform dogging

Unit of competency
National Code
CPCCDO3011
State Code
OCQ10
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
01/06/2021
Nominal Hours
32
Description
This unit specifies the skills and knowledge required to undertake basic dogging work for the purpose of shifting loads mechanically both in sight and out of sight of the crane operator. The unit includes selecting sling types and sizes and maintaining the stability of the load.It applies to workers using dogging tools and equipment, who would be expected to take responsibility for organising and completing work tasks with a high degree of self direction. Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some states and territories. For further information, check with the relevant regulatory authority.
Notes
Elements and Performance Criteria
1 Plan and prepare to perform dogging.
  • 1.1 Interpret work order and associated documentation and clarify requirements with relevant persons.
  • 1.2 Plan all work to comply with relevant legislation, regulations, standards, codes, work health and safety, environmental and workplace requirements.
  • 1.3 Select tools and equipment required for work tasks, check for serviceability and rectify or report identified faults.
  • 1.4 Confirm task sequencing schedule with relevant persons to ensure coordination.
  • 1.5 Calculate load mass and confirm using load charts and standard calculations.
  • 1.6 Calculate loads in slings and equipment to suit task requirements.
2 Sling load.
  • 2.1 Erect required safety signage and barricades and select and fit personal protective equipment (PPE).
  • 2.2 Assemble lifting devices and erect for load movement.
  • 2.3 Sling load to lifting device ready for lifting, using appropriate load slinging method.
3 Shift load.
  • 3.1 Shift load to ensure stability, in compliance with safe work method statement (SWMS).
  • 3.2 Direct load to landing position using appropriate communications in accordance with relevant Australian Standards and workplace requirements.
  • 3.3 Land load in required position on packing or bearers.
4 Remove dogging equipment from load.
  • 4.1 Dismantle load shifting equipment and inspect for wear.Complete required logbook and site records in accordance with workplace requirements.
  • 4.2 Dismantle load shifting equipment and inspect for wear.Complete required logbook and site records in accordance with workplace requirements.
5 Clean up.
  • 5.1 Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
  • 5.2 Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
No information
No information
Replaces
State Code National Code Title Type
D7375 CPCCDO3011A Perform dogging Unit of competency
State Code National Code Title Type
BJR6 AHC30824 Certificate III in Arboriculture Qualification
BGB5 CPC30720 Certificate III in Rigging Qualification