Unit of competency Outline

Date retreived
23/07/2026 4:43 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manage train planning

Manage train planning

Unit of competency
National Code
TLIW5004
State Code
AVH24
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
19/10/2015
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
030909 - Transport Engineering
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to manage train planning, in accordance with workplace procedures and regulatory requirements.It includes preparing to manage train planning, and developing and implementing strategies to optimise train planning. This unit provides an awareness of rail train planning and strategies for optimising performance. It can be applied to freight, heavy haul or metropolitan and regional passenger rail systems.In applying this unit, the following rail safety operating principles may be involved:ensuring emergencies and incidents are properly managedensuring interfaces between different organisations are properly defined and managedidentifying and managing riskprotecting persons from injuryprotecting property from damagetrack accesstrain separation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to manage train planning
  • 1.1 Goals of train planning are identified and explained
  • 1.2 Principal factors involved in train planning are identified and outlined
  • 1.3 Resources required for train planning are identified, explained and obtained
  • 1.4 Methods by which train planning performance can be measured are identified and implemented
2 Develop and implement strategies to optimise train planning
  • 2.1 Factors that contribute to optimal train planning are identified and explained
  • 2.2 Strategies for ensuring optimal train planning is maintained are developed and implemented
  • 2.3 Methods by which optimal train planning performance can be measured are developed and applied
  • 2.4 Strategies are communicated to relevant personnel
No information
No information
Replaces
State Code National Code Title Type
WI848 TLIW5004A Manage train planning Unit of competency