Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Rehabilitate tracks, quarries and landings

Rehabilitate tracks, quarries and landings

Unit of competency
National Code
FWPCOT3221
State Code
AXL42
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
13/05/2016
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
05/10/2016
Nominal Hours
65
Description
This unit of competency describes the outcomes required to identify and plan for the rehabilitation requirements of tracks, quarries and landings and to conduct renovation and revegetation operations. The unit also includes the establishment of run-off and drainage channels. The unit applies to those working in commercial harvesting operations, within a forest environment producing forest products. The unit applies to Forestry technician, Forestry Operations supervisor, Mobile plant operator, Harvesting technician.Licensing, legislative, regulatory, or certification requirements apply to this unit in some states & territories at the time of publication, and may differ according to jurisdiction
Notes
Elements and Performance Criteria
1. Identify rehabilitation requirements
  • 1.1 Review work order for rehabilitation and clarify requirements with appropriate personnel.
  • 1.2 Prepare to work safely according to organisation and site requirements.
  • 1.3 Obtain and review environmental, regulatory and legislative information relating to the rehabilitation.
  • 1.4 Inspect site and identify specific rehabilitation and revegetation requirements and drainage.
2. Plan rehabilitation operations
  • 2.1 Select appropriate equipment for work requirements and check for operational effectiveness and manufacturer recommendations.
  • 2.2 Conduct a risk assessment and implement controls.
  • 2.3 Determine sequence of rehabilitation operations to ensure that time is used efficiently and that suitable equipment is available for tasks.
  • 2.4 Advise relevant personnel of impending rehabilitation and any disruptions that may occur.
  • 2.5 Document the rehabilitation and revegetation according to organisational protocols
3. Implement repairs to tracks, quarries and landings
  • 3.1 Operate equipment in line with manufacturer recommendations and monitor performance to ensure efficiency and safety of operations.
  • 3.2 Remove and store any recoverable timber.
  • 3.3 Remove and dispose of any debris according to site procedures.
  • 3.4 Renovate tracks, quarries and landings according to rehabilitation plan, work order and site procedures.
  • 3.5 Establish run-off and drainage channels to approximate natural drain lines.
  • 3.6 Revegetate required areas, providing plants with optimal growing conditions.
  • 3.7 Record and report renovation outcomes in line with site procedures.
No information
No information
Replaces
State Code National Code Title Type
D5930 FPICOT3221B Rehabilitate tracks, quarries and landings Unit of competency
Replaced By
State Code National Code Title Type
OCR55 FWPCOT3306 Rehabilitate tracks, quarries and landings Unit of competency