Unit of competency Outline
Date retreived
23/07/2026 7:28 AM AWST
23/07/2026 7:28 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage mill logistics and support services
Manage mill logistics and support services
Unit of competency
National Code
FBPGRA4003
FBPGRA4003
State Code
BBG49
BBG49
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
27/07/2018
Field of Education
030307 - Food Processing Technology
Original Release Date
27/07/2018
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to manage support and logistics services to ensure safe and efficient operation of a flour mill and compliance with regulatory and commercial requirements.The unit applies to individuals who establish and supervise the handling, storage, despatch and distribution of materials, including grain, flour and by-products. It also covers supervision of hygiene, work health and safety, pest control and security procedures.All work must be carried out to comply with workplace procedures, in accordance with State/Territory work health and safety, and environmental regulations, legislation and standards that apply to the workplace.No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Review mill plan and flow diagram to ensure all logistics and support services are correctly identified
- 1.1 Ensure incorporation of grain and other materials receiving locations in mill plan
- 1.2 Ensure incorporation of all grain, flour and by-product storage facilities in mill plan
- 1.3 Review mill flow diagram for inclusion of all break and reduction system equipment and intermediate storage facilities
- 1.4 Ensure incorporation of all administration, maintenance, utilities and storage areas in mill plan
- 1.5 Identify directly milled and blended flour products in product flow diagrams and relate to storage and despatch facilities
2. Support product flow through mill
- 2.1 Review facilities and set operating procedures for grain receival according to mill requirements
- 2.2 Ensure operators have required training and test materials for testing grain
- 2.3 Ensure storage availability for received grain, including any divisions
- 2.4 Confirm intermediate storage requirements based on forward production schedule
- 2.5 Establish product handling, storage and despatch procedures for just-in-time customers according to safe work practices
- 2.6 Establish product handling, storage and despatch procedures for daily, weekly or other regular deliveries
- 2.7 Identify any non-standard storage and despatch requirements
- 2.8 Establish and supervise inspection and cleaning regime for bins and silos
- 2.9 Establish and supervise temperature and moisture testing for storage bins and silos
3. Establish mill stock control system
- 3.1 Integrate warehouse control and information requirements with mill management and control system according to workplace procedures
- 3.2 Ensure customer orders are passed as soon as possible after receipt to production, storage, and transport departments
- 3.3 Establish bin stock measuring frequency and method to meet mill stock control requirements
- 3.4 Set and monitor weighbridge operation and recording procedures for all bulk inward and outward grain and mill products
- 3.5 Identify locations for automatic and manual recording of internal product transfers
- 3.6 Establish authorisation and access procedures for use of additives and adjuncts to meet mill stock control requirements
4. Supervise blending of flours to meet orders
- 4.1 Supervise internal transfer of flour to holding bins
- 4.2 Determine if volumetric, on-line or batch blending is to be used
- 4.3 Determine formula for required blend, including any required additives and adjuncts
- 4.4 Specify flours to be used to most economically achieve required formula according to flour blending requirements
- 4.5 Supervise blending operation, including data entry into batch or process control computer
- 4.6 Supervise transfer of blended flour to packing, despatch or storage
5. Supervise product despatch
- 5.1 Set and monitor ‘give away’ margin above minimum weight in packed flour
- 5.2 Supervise operation of bag and sack packing, and closing equipment
- 5.3 Determine, where required, if enterprise or contract vehicles are to be used
- 5.4 Oversee bag, sack and bulk flour despatch as appropriate according to workplace practices
- 5.5 Supervise packing and despatch of by-products, including palletisation of wheat-feed according to workplace practices
6. Manage work health and safety, mill safety, security and regulatory procedures for mill or area of responsibility
- 6.1 Establish or review perimeter security according to mill safety standards and security regulatory procedures
- 6.2 Confirm site access control point for all vehicle and pedestrian traffic
- 6.3 Review adequacy of truck holding and turnaround facilities
- 6.4 Establish or review site work health and safety plan and procedures
- 6.5 Ensure personal protective equipment, pedestrian walkways, and other pedestrian safety procedures are known and followed
- 6.6 Review fire protection plan and fire protection facilities, including location and type of extinguishers, suppression systems and alarms
- 6.7 Review visitor reception, registration and escort protocols for visitor access to non-administration areas
- 6.8 Establish compliance procedures for environmental, food safety and other regulatory requirements
7. Review mill dust control procedures
- 7.1 Review equipment and storage cleaning schedule and procedures for dust control effectiveness
- 7.2 Arrange regular inspections for potential ignition sources to meet safety standards
- 7.3 Review current dust control and dust explosion relief equipment and arrange for any required maintenance or additional dust control/dust explosion relief equipment according to manufacturers’ specifications
- 7.4 Establish training in dust control procedures for all employees and contractors
8. Manage pest control procedures
- 8.1 Review site pest control plan to meet production and food safety requirements
- 8.2 Ensure all employees are trained to identify signs of insect, rodent and bird infestation
- 8.3 Establish inspection, sampling and testing regime for all equipment, storage areas and all inward and outward goods
- 8.4 Determine cause and type of infestations
- 8.5 Specify appropriate control measures for insect, rodent and bird infestation
- 8.6 Supervise protection of employees, community and product during treatments
- 8.7 Ensure compliance with regulations and environmental guidelines
- 8.8 Establish pest reporting and treatment recording procedures
9. Manage contractors for mill or area of responsibility
- 9.1 Establish and maintain schedule of contractors and their capabilities for services not performed in-house
- 9.2 Confirm procedures and delegations for engaging contractors
- 9.3 Develop site access register for contractors according to workplace requirements
- 9.4 Ensure contractors are briefed on all mill regulatory and commercial requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE607 | FDFGR4003A | Manage mill logistics and support services | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BDO6 | FBP40117 | Certificate IV in Flour Milling | Qualification |