Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Calculate and cost construction work
Calculate and cost construction work
Unit of competency
National Code
CPCCCM2003B
CPCCCM2003B
State Code
D7351
D7351
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
21/05/2014
Field of Education
040307 - Building Construction Economics
Original Release Date
21/05/2014
Nominal Hours
20
Description
This unit of competency specifies the outcomes required to estimate materials, labour and time requirements and establish costs for provision of services or products in basic construction work. It covers the gaining of information; the estimation of materials, labour and time; the calculation of costs; and the associated documentation.
Notes
Elements and Performance Criteria
1. Gather information.
- 1.1. Details of requirements are obtained and understood through discussion with customer or from information supplied.
- 1.2. Plans and specifications are accessed and site is inspected to confirm full requirements.
- 1.3. Details of products and services to be provided are developed and checked for availability and as fit for purpose.
- 1.4. Delivery point and methods of transportation are determined where necessary.
- 1.5. Details are accurately recorded and checked in accordance with workplace procedures.
2. Estimate materials, labour and time.
- 2.1. Work, including preparatory tasks, is planned and sequenced to cover all necessary activity.
- 2.2. Types and quantities of materials required for product work are estimated based on availability, fitness for purpose and current costs.
- 2.3. Labour requirements to perform work are estimated to complete the work activity.
- 2.4. Time requirements to perform work are accurately estimated and checked with appropriate personnel.
3. Calculate costs.
- 3.1. Total materials, labour and overhead costs are calculated in accordance with workplace procedures and statutory requirements.
- 3.2. Total work cost is calculated, including overheads and mark-up percentages set by appropriate personnel.
- 3.3. Final cost for work is calculated and checked for accuracy.
4. Document and verify details.
- 4.1. Details of costs and charges are clearly and accurately documented in accordance with workplace procedures.
- 4.2. Costs, calculations or other details are verified in accordance with workplace procedures and current costing data.
- 4.3. Quotation/tender documentation is prepared and verified.
- 4.4. Costing documents are accurately completed for future reference in accordance with workplace procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Plans and specifications include:
sketches or drawings
statements of requirements, including environmental requirements relating to the acquisition, use and disposal of materials
materials lists and quantity schedules
building codes
materials specifications, including specifications of material reuse and recycling.
Types and quantities of materials include consumables such as:
aluminium and steel framing and steel reinforcing
bricks, masonry blocks and pavers
cement, sand, aggregates and bonding agents
decorative finishing materials, such as wallpaper, laminates, gilding materials, lacquers and polishes
fixings, fastenings and adhesives
fuel and lubricants
paint, solvents and cleaning agents
tiles and glass
timber, plywoods, fibreboard and composites
wall and ceiling lining materials, plaster and platers products and external claddings.
Labour and overhead costs include:
labour costs, such as:
personal protective equipment
site facilities
wages and on-costs
overhead costs, such as:
administration
Insurance
local government fees and charges
plant and equipment hire
transport
use of communication technology
waste removal fees.
Costing documents include:
job sheets
materials list and estimates
quotations and tenders
work schedules.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Plans and specifications include:
sketches or drawings
statements of requirements, including environmental requirements relating to the acquisition, use and disposal of materials
materials lists and quantity schedules
building codes
materials specifications, including specifications of material reuse and recycling.
Types and quantities of materials include consumables such as:
aluminium and steel framing and steel reinforcing
bricks, masonry blocks and pavers
cement, sand, aggregates and bonding agents
decorative finishing materials, such as wallpaper, laminates, gilding materials, lacquers and polishes
fixings, fastenings and adhesives
fuel and lubricants
paint, solvents and cleaning agents
tiles and glass
timber, plywoods, fibreboard and composites
wall and ceiling lining materials, plaster and platers products and external claddings.
Labour and overhead costs include:
labour costs, such as:
personal protective equipment
site facilities
wages and on-costs
overhead costs, such as:
administration
Insurance
local government fees and charges
plant and equipment hire
transport
use of communication technology
waste removal fees.
Costing documents include:
job sheets
materials list and estimates
quotations and tenders
work schedules.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications to the estimation and costing of work
as a minimum, estimate and cost three varied jobs, including:
estimate quantities of material required
determine the types and amount of labour required to complete the work
estimate time required to complete the work
estimate overheads associated with the job
a written quotation/tender for each of the work requirements.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications to the estimation and costing of work
as a minimum, estimate and cost three varied jobs, including:
estimate quantities of material required
determine the types and amount of labour required to complete the work
estimate time required to complete the work
estimate overheads associated with the job
a written quotation/tender for each of the work requirements.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9372 | CPCCCM2003A | Calculate and cost construction work | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BBA89 | CPCCCM3005 | Calculate costs of construction work | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| 1599 | 52443WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| AZO0 | CUA40415 | Certificate IV in Live Production and Technical Services | Qualification |
| J705 | CUA50413 | Diploma of Live Production and Technical Services | Qualification |
| J700 | CUA40413 | Certificate IV in Live Production and Technical Services | Qualification |
| AZK8 | CUA50415 | Diploma of Live Production and Technical Services | Qualification |
| J706 | CUA50513 | Diploma of Live Production Design | Qualification |
| D395 | CPC30611 | Certificate III in Painting and Decorating | Qualification |
| D405 | CPC31611 | Certificate III in Paving | Qualification |
| J489 | CPC31812 | Certificate III in Shopfitting | Qualification |
| AYW7 | NWP30215 | Certificate III in Water Industry Operations | Qualification |