Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage permit to work system
Manage permit to work system
Unit of competency
National Code
UEPOPS502
UEPOPS502
State Code
OAG16
OAG16
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/05/2019
Field of Education
080399 - Business And Management, N.e.c.
Original Release Date
15/05/2019
Nominal Hours
36
Description
This unit involves the skills and knowledge required to manage the development, implementation and review of the permit to work system in a power generation facility.Permits to workare a formal system used to control high risk activities in power generation facilities, they specify the control measures to be used. They ensure that all hazards and precautions have been considered beforeany hazardous workbegins.Competency in this unit requires the ability to plan for implementation of permit to work procedures,develop permit to work system and procedures, manage permit to work systemand audit permit to work procedures. Individuals will, in general, work as an operator with responsibility for managing the permit to work system in a power generation facility. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.Note: Workplace practiceThe application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.
Notes
Elements and Performance Criteria
1 Plan for implementation of permit to worksystem
- 1.1 Statistical records are consulted on permit to work implementation, in accordance with workplace procedures
- 1.2 Requirements for the development of permit to work procedures are identified and confirmed, in accordance with workplace procedures and legislation
- 1.3 Key stakeholders or equipment affected by the permit to work system are identified, in accordance with workplace procedures
- 1.4 Consultation with key stakeholders to determine contingency plan implementation and timetable of review is carried out, in accordance with workplace policies and procedures
2 Develop permit to work system and procedures
- 2.1 Permit to work procedures are planned and developed in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) legislation requirements
- 2.2 Resources are obtained and utilised for development of permit to work system, in accordance with workplace procedures
- 2.3 Permit to work procedures are documented and approved, in accordance with workplace procedures
3 Implementpermit to work system
- 3.1 Permit to work system incidents are identified, managed and recorded, in accordance with workplace procedures and legislation requirements
- 3.2 Permit to work incidents are investigated and assessed, in accordance with workplace procedures and legislation requirements
- 3.3 Results and recommendations of incident investigations are documented and confirmed with appropriate personnel, in accordance with workplace procedures and legislation requirements
4 Audit permit to work procedures
- 4.1 Permit to work system is audited and results are evaluated and managed, in accordance with workplace procedures
- 4.2 Audit results are documented and reports including recommendations are confirmed with appropriate personnel, in accordance with workplace procedures and legislation requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE435 | UEPOPS502B | Manage permit to work system | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODY23 | UEPOPS055 | Manage permit to work system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEC3 | UEP50218 | Diploma of ESI Generation - Operations | Qualification |
| BEB7 | UEP50118 | Diploma of ESI Generation - Systems Operations | Qualification |
| BEB3 | UEP50318 | Diploma of ESI Generation (Maintenance) | Qualification |