Unit of competency Outline

Date retreived
22/07/2026 6:38 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Tile irregular roofs

Tile irregular roofs

Unit of competency
National Code
CPCCRT3002A
State Code
W9493
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
26/03/2013
Field of Education
040315 - Roof Fixing
Original Release Date
26/03/2013
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to install roof tiles to a roof incorporating irregular shapes or unequal pitches and incorporating a dormer window with tiled surrounds.It includes the preparation, setting out, installing and fixing of tiles to a roof.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Prepare roof face.
  • 2.1. Fall arrest system is installed to roof perimeter following regulatory and workplace requirements.
  • 2.2. Elevator is assembled and operated in accordance with manufacturer instructions and workplace procedures.
  • 2.3. Roof surface is set out, sarked and battened to manufacturer recommendations for the specified tile and job specifications.
  • 2.4. Roof surface and structure are checked for stability and safe access to roof for tile installation.
  • 2.5. Tiles are loaded onto roof, supported and evenly distributed.
3. Install tiles.
  • 3.1. Roof tiles are spread, cut, secured and installed to manufacturer specifications.
  • 3.2. Hip and ridge tiles are bedded using correct mortar mix, maintaining alignment.
  • 3.3. Valley, hips, ridges, flexible point plus acrylic finishes and gables are pointed with like-colour mortar to a flush, smooth finish in accordance with job specifications.
4. Tile roof openings and lay back surfaces and/or facades.
  • 4.1. Opening surrounds are checked for soakers and flashings, and prepared for tiles.
  • 4.2. Surrounds and weatherproofing are tiled to job specifications.
  • 4.3. Tiles are spread and secured to steep and vertical surfaces, by individual tile fixing to specifications.
5. Clean up.
  • 5.1. Roof, guttering and downpipes are cleared free of waste and surplus material.
  • 5.2. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 5.3. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to tiling an irregular roof
relevant Australian standards
safe work procedures relating to tiling an irregular roof
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
includes preparation for tiling an irregular roof by sarking and battens and the fixing and finishing of tiles, including their installation, bedding and pointing
irregular roofs include roofs constructed to irregular shaped plans where corners are not right angled and include Dutch hip, turrets, spires, unequal pitch surfaces and Cape Cod, mansard, bellcast, pyramid, bed and point valleys, and steel framed roof trusses
openings in irregular roofs include chimneys, roof ventilators, cupolas, dormer windows, two storey inserts, skylights, pipes and flues
specifications include tile colour, tile profile, type of bond, nailing sequence and wind category
tiles may be interlocking (terracotta) or non-interlocking (concrete) and conform to the requirements of relevant Australian Standards
types of terracotta tiles include Marseille, modern French, Swiss, Spanish, Roman and new French
types of concrete tiles include Elebane, Villa, Centurian, Chateau and shingle (concrete)
pointing material may be flexible pointing material or its equivalent.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in proximity to others
working safely on roofs
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
air compressors and hoses
blowers
brooms
buckets
calculators
chalk lines
chisels
concrete mixers
elevators
fall safety devices
gutter protectors
hammers
hand saws
high pressure water cleaners
ladders
measuring tapes and rules
nail bags
nail guns
pincers
power drills
power leads
power saws
shovels
squares
string lines
tile cutters
trowels
may include:
blocks
breaks or cutting irons
guillotines
rippers
scaffolds
slate cutters
slate reefers
slater's hammers
slating knives
small compressors
small petrol or diesel engines.
Materials:
include:
adhesives
concrete and terracotta tiles
fastenings and other mechanical fixings
flashings
mortar
sarking materials
timber and metal battens
may include:
flexible pointing material
lead
shingles
slate
other hand manufactured products.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater management
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, tile 45 square metres of an irregular roof frame of any type, incorporating a 1.5m hip, a 1.5m valley, a 1.5m gable and a 1.5m top ridge, including the appropriate sarking, battens, tile cutting, bedding and pointing, ensuring:
correct identification of requirement and installation and finishing of the tiles
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1874 BCGRT3002B Tile an irregular roof Unit of competency
Replaced By
State Code National Code Title Type
OCP50 CPCCRT3002 Tile irregular roofs Unit of competency
State Code National Code Title Type
W584 CPC30808 Certificate III in Roof Tiling Qualification
D397 CPC30811 Certificate III in Roof Tiling Qualification
J487 CPC30812 Certificate III in Roof Tiling Qualification