Unit of competency Outline

Date retreived
22/07/2026 9:58 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install sprinkler irrigation components

Install sprinkler irrigation components

Unit of competency
National Code
AHCIRG312A
State Code
WE018
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
22/06/2012
State Implementation and Classification
Approved Date
24/06/2014
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
24/06/2014
Nominal Hours
60
Description
This Unit covers the process of installing sprinkler irrigation systems and defines the standard required to: organise resources for installation work; set out and prepare site; install irrigation components; complete installation work; and commission sprinkler irrigation systems.
Notes
Elements and Performance Criteria
1 Organise resources for installation of sprinkler irrigation systems
  • 1.1 Materials, tools, equipment and machinery are selected according to the irrigation system design requirements and enterprise work procedures
  • 1.2 The construction site for the irrigation system and construction method is identified according to the site and irrigation system plans and enterprise work procedures
  • 1.3 Parts and equipment delivered to site are checked according to system drawings and specifications
  • 1.4 Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer specifications and enterprise work procedures
  • 1.5 Occupational Health and Safety (OHS) hazards are identified, risks assessed, controls implemented and reported to the supervisor
  • 1.6 Suitable safety and personal protective equipment (PPE) are selected, used and maintained
  • 1.7 Water supply is checked to ensure that it is compatible with system specifications
2 Set out and prepare site
  • 2.1 Measurement and marking out of irrigation lines are consistent with the plan
  • 2.2 Trenches, where constructed, are at the specified depth without damage to services, facilities, features and established plants
  • 2.3 Equipment operation and work practices conform to enterprise and legislative OHS requirement
  • 2.4 Regulations and legislation relevant to the situation are observed
  • 2.5 Work practices reflect sustainable principles and respond to local community requirements
3 Install sprinkler irrigation components
  • 3.1 Components are assembled and connected according to the plan, and joints are completed and tested according to manufacturer specifications
  • 3.2 Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines
  • 3.3 A clean and safe work area is maintained while installation work is carried out
  • 3.4 Tools appropriate to the task being undertaken are chosen and used according to guidelines and safe working practices are employed
4 Complete installation work
  • 4.1 The work site is levelled off to plan specifications and enterprise work procedures
  • 4.2 The system configuration and capacity matches the installation plan
  • 4.3 The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures
  • 4.4 Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures
5 Assist in commissioning a sprinkler irrigation system
  • 5.1 Pumping system is connected
  • 5.2 Start-up sequence is in accordance with operations manual
  • 5.3 System is flushed as required
  • 5.4 Operating faults are identified and corrective actions taken according to the operations manual
  • 5.5 Testing and monitoring equipment are calibrated to manufacturer specifications
  • 5.6 Work outcomes are recorded or reported to the supervisor according to enterprise work procedures
The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Sprinkler irrigation systems may include:
any systems that use spray or rotor type sprinklers to distribute irrigation water at higher volume including pop-up sprinklers, fixed, and movable sprinklers (e.g. K Line and Ezy Shift).
Sprinkler irrigation components may include:
pumps
sprinklers
nozzles
risers
pipe or tubing
valves
regulators and gauges
laterals.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit
The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
organise resources for installation work
set out and prepare site
install irrigation components
complete installation work
commission irrigation systems.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
No information
State Code National Code Title Type
J156 AHC32412 Certificate III in Irrigation Qualification
J269 AHC33412 Certificate III in Seed Production Qualification