Unit of competency Outline

Date retreived
22/07/2026 7:44 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Remove and install aircraft pressurisation control system components

Remove and install aircraft pressurisation control system components

Unit of competency
National Code
MEA208
State Code
AUE57
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
12/02/2015
State Implementation and Classification
Approved Date
22/07/2015
Field of Education
031503 - Aircraft Maintenance Engineering
Original Release Date
22/07/2015
Nominal Hours
40
Description
This unit of competency requires application of hand skills and the use of maintenance documentation/publications in the removal and installation of pressurisation control system components of fixed wing aircraft that have pressurisation systems, during scheduled or unscheduled maintenance. Work may be performed individually or as part of a team.The unit is part of the Avionic Certificate IV (Aircraft Maintenance Stream) training pathway and is also part of the Mechanical Aircraft Maintenance Engineer licensing pathway.The unit is used in workplaces that operate under the airworthiness regulatory systems of the Australian Defence Force (ADF) and the Civil Aviation Safety Authority (CASA). Where a CASA licensing outcome is sought this unit forms part of the CASA requirement for the granting of the chosen maintenance certification licence under Civil Aviation Safety Regulation (CASR) Part 66, in accordance with the licensing provisions in the Companion Volume Implementation Guide.
Notes
Elements and Performance Criteria
1. Remove pressurisation control system components
  • 1.1 System is rendered safe and prepared in accordance with the applicable maintenance manual and isolation tags are fitted, where necessary, to ensure personnel safety
  • 1.2 Pressurisation control system component removal is carried out in accordance with the applicable maintenance manual while observing all relevant work health and safety (WHS) requirements
  • 1.3 Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
  • 1.4 Removed components are tagged and packaged in accordance with specified procedures
2. Install aircraft pressurisation control system components
  • 2.1 Pressurisation control system components to be installed are checked to confirm correct part numbers, modification status, serviceability and shelf life
  • 2.2 Physical installation of pressurisation control components is performed in accordance with the applicable maintenance manual
  • 2.3 System is reinstated to correct operational condition in preparation for testing, as necessary
  • 2.4 Required maintenance documentation is completed and processed in accordance with standard enterprise procedures
No information
No information
Replaces
State Code National Code Title Type
D4397 MEA208C Remove and install aircraft pressurisation control system components Unit of competency