Unit of competency Outline
Date retreived
23/07/2026 12:04 AM AWST
23/07/2026 12:04 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay rails for cane rail systems
Lay rails for cane rail systems
Unit of competency
National Code
FDFSUG202A
FDFSUG202A
State Code
WD832
WD832
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
039907 - Rail Operations
Original Release Date
31/07/2014
Nominal Hours
18
Description
This unit describes the outcomes required to lay rails. It can apply to both construction of new track and repair of existing track. Track has been pre-welded to meet track design and construction specifications.
Notes
Elements and Performance Criteria
1 Plan and prepare work
- 1.1 The location and scope of work are identified
- 1.2 Materials required to complete the work are confirmed and available
- 1.3 Equipment status is confirmed and pre-operational checks are carried out
- 1.4 Personal protective equipment is selected, correctly fitted and used
- 1.5 Safety procedures are followed to confirm that work is clearly signed and relevant authorities are advised that work is in progress
- 1.6 Site is inspected prior to commencing work to identify and remove potential hazards
2 Lay rails
- 2.1 Rail lengths are positioned and fixed to meet construction specifications
3 Complete work
- 3.1 Unused materials are stored as required
- 3.2 Tools, plant and equipment is cleaned and stored as required
- 3.3 Workplace information is recorded according to workplace recording requirements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Cane transport network
Cane transport network features and their characteristics may include:
main and branch lines
yards
sidings
loops
dump points and pads.
Information systems
Information systems may be print or screen based
Equipment and materials
Equipment and materials may include:
hand tools
pneumatic tools
base plates
fish plates
clips
dog spikes
anchors
screws
insulating biscuits and
camber plates.
Teamwork
Work may require the ability to work within a team environment
Communication methods
Communication methods may include:
use of two-way radios.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Cane transport network
Cane transport network features and their characteristics may include:
main and branch lines
yards
sidings
loops
dump points and pads.
Information systems
Information systems may be print or screen based
Equipment and materials
Equipment and materials may include:
hand tools
pneumatic tools
base plates
fish plates
clips
dog spikes
anchors
screws
insulating biscuits and
camber plates.
Teamwork
Work may require the ability to work within a team environment
Communication methods
Communication methods may include:
use of two-way radios.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
interpret workplace information
estimate material requirements for a given project
confirm that rail lengths meet design and construction specifications
position rails to meet specification
take corrective action in response to abnormal or unacceptable performance
use appropriate communication methods and equipment
report and/or record corrective action as required.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Site and related project information
Relevant codes of practice and industry standards
Materials handling equipment and relevant hand and power tools
Operating procedures and related advice on equipment operation
Rails - pre-welded to meet track design and construction specifications and related materials
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit. This may include:
SUG219A Lay sleepers
AHCMOM207A Conduct front end loader operations.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
interpret workplace information
estimate material requirements for a given project
confirm that rail lengths meet design and construction specifications
position rails to meet specification
take corrective action in response to abnormal or unacceptable performance
use appropriate communication methods and equipment
report and/or record corrective action as required.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Site and related project information
Relevant codes of practice and industry standards
Materials handling equipment and relevant hand and power tools
Operating procedures and related advice on equipment operation
Rails - pre-welded to meet track design and construction specifications and related materials
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit. This may include:
SUG219A Lay sleepers
AHCMOM207A Conduct front end loader operations.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYL23 | SUGSLRT2A | Lay rails | Unit of competency |
| AYL24 | SUGSLSP2A | Lay sleepers | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAN45 | FBPSUG2002 | Lay rails for cane rail systems | Unit of competency |