Unit of competency Outline

Date retreived
23/07/2026 4:44 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Moor ships for transfer of bulk processed particulates or fluids

Moor ships for transfer of bulk processed particulates or fluids

Unit of competency
National Code
PMAOPS242
State Code
AXN28
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
02/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
031799 - Maritime Engineering And Technology, N.e.c.
Original Release Date
05/08/2016
Nominal Hours
25
Description
This unit of competency covers the skills and knowledge required to moor ships that are transporting bulk fluids or particulates. This unit of competency applies to the berthing of vessels transporting liquefied natural gas (LNG), liquefied petroleum gas (LPG), other bulk fluids and bulk processed particulates, such as iron ore or alumina. It applies to land-based moorings, floating storage and offtake (FSO)/floating production storage and offtake (FPSO) vessel/buoy or similar moorings.This unit of competency applies to operators who are required to prepare the mooring area, identify and control hazards, follow instructions and procedures to position, secure and release vessel, and identify problems and take appropriate action. This unit of competency applies to an individual who may work alone although under routine direction and supervision. They may work as part of a team or group and will work in liaison with other shift team members and the control room operator and ‘shipping officer’ (or other suitably authorised operator), as appropriate. These operators will liaise with port/jetty personnel as well as relevant ship personnel. When not involved with ship loading/unloading they may be expected to fulfil more traditional plant operations roles.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Identify work and compliance requirements
  • 1.2 Identify and control hazards
  • 1.3 Coordinate with appropriate personnel
  • 1.4 Check operational status of required plant/equipment
  • 1.5 Complete any required pre-berthing checks
2 Deploy hazard and environmental controls in accordance with procedures
  • 2.1 Check required controls, including health, safety and environment (HSE) controls, are available and functional
  • 2.2 Deploy controls
  • 2.3 Prepare mooring area for operation
  • 2.4 Withdraw controls
3 Berth ship in accordance with procedures
  • 3.1 Communicate with relevant personnel
  • 3.2 Receive and carry out instructions from shipping officer
  • 3.3 Throw/heave ships lines and secure vessel
  • 3.4 Guide ship to position required to receive/discharge
  • 3.5 Use capstan winch to ‘walk ship’ to required position
  • 3.6 Make fast to mooring (wharf, dolphin or buoy)
  • 3.7 Ensure all hazard controls are followed
  • 3.8 Connect equipment required for transfer
  • 3.9 Set quick release hooks
4 Release ship in accordance with procedures
  • 4.1 Communicate with relevant personnel
  • 4.2 Receive and carry out instructions from shipping officer
  • 4.3 Disconnect any connected equipment
  • 4.4 Release vessel
  • 4.5 Ensure all hazard controls are followed
5 Recognise problems and take action
  • 5.1 Monitor mooring operation throughout the process
  • 5.2 Adjust process as required by procedures
  • 5.3 Take actions to resolve problems
No information
No information
Replaces
State Code National Code Title Type
WG540 PMAOPS242A Moor ships for transfer of bulk processed particulates or fluids Unit of competency