Unit of competency Outline
Date retreived
22/07/2026 10:13 PM AWST
22/07/2026 10:13 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform cable pit/trench/excavation rescue
Perform cable pit/trench/excavation rescue
Unit of competency
National Code
UETTDRRF07
UETTDRRF07
State Code
OBH32
OBH32
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
061301 - Occupational Health And Safety
Original Release Date
04/12/2019
Nominal Hours
0
Description
This unit covers the performance of cable pit/trench/excavation rescue procedures as they apply to live low voltage (LV) cable jointing in the workplace. It specifies the mandatory requirements of rescue from a cable pit/trench/excavation and how they apply in the context of transmission, distribution or rail work functions. It encompasses responsibilities for health, safety and risk management processes at all operative levels and adherence to safety practices as part of the normal way of doing work.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to perform cable pit/trench/excavation rescue
- 1.1 Instruction in hazards and risk control measures for specific work functions and work areas are identified and obtained
- 1.2 Tools and emergency equipment are checked for safety, functionality and placed in an accessible location to facilitate response and rescue according to established procedures
2 Carry out cable pit/trench/excavation rescue
- 2.1 Workplace procedures and work instructions for controlling risk are followed
- 2.2 Workplace procedures for accessing the cable pit/trench/excavation, and removing the victim, where necessary, from contact with live apparatus are followed
- 2.3 Workplace procedures for removing the victim, where necessary, from the cable pit/trench/excavation are followed
- 2.4 Workplace procedures for carrying out cardiopulmonary resuscitation (CPR), if required at the site, and treatment, where necessary, by medical professionals are followed
- 2.5 The worksite is secured and entry controlled until appropriate authorities release the site
3 Complete the cable pit/trench/excavation rescue procedures
- 3.1 Processes for reporting accidents and/or incidents to authorised personnel are confirmed in accordance with established procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD708 | UETTDRRF07B | Perform cable pit/trench/excavation rescue | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN38 | UETDRRF001 | Perform cable pit/trench/excavation rescue | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AE032 | UETSS00038 | Perform Cable Pit-Trench-Excavation Rescue | Skill set |
| AE040 | UETSS00039 | Perform Cable Pit-Trench-Excavation Rescue and CPR | Skill set |